News

Environmental study submitted for thermal project in Bogatic

Published

March 15, 2016

Comments

comments icon

0

Share

Published:

March 15, 2016

Comments:

comments icon

0

Share

The Municipality of Bogatić, located in western Serbia, requested approval from the national Ministry of Agriculture and Environmental Protection for an environmental impact assessment study for the project of thermal water well BB-1.

The well is part of a complex of thermal springs discovered in early 1980s, which wasn’t utilized properly until a few years ago the first section of an aqua park was opened and the facility continued to develop. BB-1 is going to be tapped for a project of district heating of local public buildings and homes. Estimated capacity is 37 MW from a flow of 20 litres per second. Results of initial research had shown the area has potential geothermal capacity of at least 150 MW. The source is water from a depth of 475 metres with inlet temperature of 76 degrees Celsius.

The pilot project should be implemented in 13 public facilities. Funds of EUR 2.6 million were secured from European Union’s Instrument for Pre-Accession Assistance.

Related Articles

masdar socar green solar power projects azerbaijan

Masdar, SOCAR join forces on 760 MW of solar in Azerbaijan

23 November 2024 - Masdar and SOCAR Green have reached financial close for the 445 MW Bilasuvar and 315 MW Neftchala solar projects in Azerbaijan

wind farm ljubusa tomislavgrad

Concession signed for 80 MW wind farm in Tomislavgrad

22 November 2024 - Alpha Wind has been granted a concession to build the 80 MW Ljubuša wind farm in the municipality of Tomislavgrad.

zagreb waste management center tomasevic

Zagreb picks technological solution for city’s waste management system

22 November 2024 - The city has selected technological solution C, one of three proposed, based on an analysis of municipal waste processing technologies

Dentons advises EnergoNuclear EPCM deal Cernavoda

Dentons advises EnergoNuclear on EPCM deal for Cernavodă project

22 November 2024 - Dentons advised EnergoNuclear on an engineering, procurement, and construction management (EPCM) contract for Cernavodă 3 and 4