Renewables

North Macedonia first in region to set coal phaseout date – thermal power plants will be shut down by 2028

Zoran-Zaev-North-Macedonia-first-in-region-to-set-coal-phaseout-date-–-thermal-power-plants-will-be-shut-down-by-2028

Zoran Zaev (photo: Government of North Macedonia)

Published

June 25, 2021

Country

Comments

comments icon

0

Share

Published:

June 25, 2021

Country:

Comments:

comments icon

0

Share

North Macedonia is the first country in the Western Balkans to make a decision on abandoning coal, announcing it will shut down its thermal power plants by 2028.

Prime Minister Zoran Zaev has said the government plans to close North Macedonia’s coal-fired power plants by 2028.

To offset the impact of the move on electricity production, the country will invest in developing a total of 2,200 MW of renewable energy capacities, Zaev told Telma TV, according to a report by news portal Nezavisen.

According to him, this will be part of North Macedonia’s green deal and a transition towards new energy sources.

The country plans to build 1,600 MW of solar power plants, and 600 MW of wind farms

Currently, thermal power plants account for about a half of the country’s electricity output, covering about a third of total consumption.

The government has developed a plan for shutting down power plants burning coal and fossil fuels for the period until 2028, Zaev said, adding that North Macedonia will build photovoltaic power plants with a combined installed capacity of 1,600 MW and wind farms totaling 600 MW. These will be new power plants with a total capacity of 2,200 MW, he said.

North Macedonia was the first country to announce that it was considering a coal phaseout, back in early 2020. At the time, three scenarios were being considered: two of them envisaged a 2025 deadline, and the third one entailed a coal exit by 2040.

Over the past few years, the state and private companies have been investing in large-scale solar, wind, and hydropower projects in North Macedonia. Germany’s wpd has recently announced it will develop a 400 MW wind farm, while state owned ESM is preparing to build a solar power plant with a capacity of 300-350 MW.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

montenegro france afd loan spajic vukovic

Montenegro signs EUR 50 million loan agreement with France’s AFD

20 November 2024 - AFD will support Montenegro's reforms in waste management, renewable energy, sustainable forestry, and climate action

asor cop29 workshops AQSIA baku

ASOR from Serbia, Azerbaijan-based AQSIA hold renewables workshops at COP29

19 November 2024 - The Association for Sustainable Development (ASOR) from Serbia and Azerbaijani group AQSIA held three workshops on renewables at COP29

romania coal mines closure Jiu Valley

Romania gets nod for EUR 790 million in aid for coal mine closure

18 November 2024 - The coal mines are located in the Jiu Valley, Romania’s main coal region and one of the 20 coal regions in the European Union

Vucic Serbia wants Azerbaijan participate major gas power project

Vučić: Serbia wants Azerbaijan to participate in major gas power project

13 November 2024 - Serbian President Aleksandar Vučić said the government is starting talks with Azerbaijan to build a 1 GW gas power plant or two smaller ones