Renewables

North Macedonia first in region to set coal phaseout date – thermal power plants will be shut down by 2028

Zoran-Zaev-North-Macedonia-first-in-region-to-set-coal-phaseout-date-–-thermal-power-plants-will-be-shut-down-by-2028

Zoran Zaev (photo: Government of North Macedonia)

Published

June 25, 2021

Country

Comments

comments icon

0

Share

Published:

June 25, 2021

Country:

Comments:

comments icon

0

Share

North Macedonia is the first country in the Western Balkans to make a decision on abandoning coal, announcing it will shut down its thermal power plants by 2028.

Prime Minister Zoran Zaev has said the government plans to close North Macedonia’s coal-fired power plants by 2028.

To offset the impact of the move on electricity production, the country will invest in developing a total of 2,200 MW of renewable energy capacities, Zaev told Telma TV, according to a report by news portal Nezavisen.

According to him, this will be part of North Macedonia’s green deal and a transition towards new energy sources.

The country plans to build 1,600 MW of solar power plants, and 600 MW of wind farms

Currently, thermal power plants account for about a half of the country’s electricity output, covering about a third of total consumption.

The government has developed a plan for shutting down power plants burning coal and fossil fuels for the period until 2028, Zaev said, adding that North Macedonia will build photovoltaic power plants with a combined installed capacity of 1,600 MW and wind farms totaling 600 MW. These will be new power plants with a total capacity of 2,200 MW, he said.

North Macedonia was the first country to announce that it was considering a coal phaseout, back in early 2020. At the time, three scenarios were being considered: two of them envisaged a 2025 deadline, and the third one entailed a coal exit by 2040.

Over the past few years, the state and private companies have been investing in large-scale solar, wind, and hydropower projects in North Macedonia. Germany’s wpd has recently announced it will develop a 400 MW wind farm, while state owned ESM is preparing to build a solar power plant with a capacity of 300-350 MW.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Ember Warming 2024 global power demand rise with fossil fuels

Ember: Warming’s 2024 share of global power demand rise was covered with fossil fuels

09 April 2025 - Renewables and nuclear energy met 79,1% of 2024 global power demand growth. The fossil fuels share was bigger than the part attributed to the annual rise in temperatures.

croatia methane greenpeace catf analysis oil gas ina

Croatia among EU’s top three emitters of methane from oil, gas industry

08 April 2025 - The first large independent analysis in Croatia of methane emissions from the oil and gas infrastructure was carried out, according to Greenpeace Croatia

croatia social plan for climate policy marija vuckovic minister

Croatia earmarks EUR 1.6 billion for Social Plan for Climate Policy

08 April 2025 - The Ministry of Environmental Protection and Green Transition has presented the Social Plan for Climate Policy and the EU ETS 2

Join Young Bled Strategic Forum Join – Applications now open

Join Young Bled Strategic Forum – applications now open

04 April 2025 - Applications for the Young Bled Strategic Forum, taking place from August 29 to 31 in Pokljuka in Slovenia, are now officially open