Electricity

Albania introduces market based procurement of balancing services

Albania introduces market based procurement of balancing services

Photo: 子墨 黄 from Pixabay

Published

April 16, 2021

Country

Comments

comments icon

0

Share

Published:

April 16, 2021

Country:

Comments:

comments icon

0

Share

The new balancing rules in force as of April introduce market based procurement of balancing services and imbalance price formation. Independent hydro power producers (HPPs) became responsible parties for their imbalances.

Market participants can now offer balancing services in Albania, and may hedge their own balancing responsibility by creating or joining balance groups, according to the Secretariat of the Energy Community.

Independent hydro power producers, which became responsible parties for their imbalances

This will be important in particular for independent hydro power producers (HPPs), which became responsible parties for their imbalances with the creation of the balancing market as well.

A balance group that integrates small HPPs in Albania would ensure efficient integration of these producers into the electricity market and allow them to optimise balancing costs, the secretariat said.

The secretariat will support HPPs and their counterparties in designing the most appropriate solutions.

The new balancing rules have helped to resolve KESH- Energji Ashta dispute

The new balancing rules pave the way for the resolution of a long-lasting dispute related to balancing responsibility between a private investor, Energji Ashta hydropower plant, and state-owned power utility KESH, related to balancing responsibility.

Energji Ashta HPP is owned by power companies Verbund and EVN.

The balance group arrangements between KESH and Ashta which bring the dispute to an end are in operation as of  April 1, the secretariat said.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

north macedonia power line dalekovod kodar elnos mepso croatia serbia bih

Firms from Croatia, BiH, Serbia to build power line in North Macedonia

12 December 2025 - The contracted works include the construction of a 400 kV power line from the 400/110 kV Bitola 2 substation to the border with Albania 

slovenia climate vulnerability risks energy assessment

Slovenia draws up first climate vulnerability, risks assessment for energy sector

12 December 2025 - The assessment was prepared by the Ministry of the Environment, Climate and Energy, in cooperation with the Jožef Stefan Institute

Turkey awards 1 15 GW wind power auctions all at EUR 35 per MWh

Turkey awards 1.15 GW in wind power auctions – all at just EUR 35 per MWh

12 December 2025 - The six winners from the latest round of wind power auctions under the YEKA mechanism in Turkey have EUR 35 per MWh guaranteed

IEA, Employment in the energy sector is growing twice as fast as in the global economy

IEA: Employment in energy sector grows two times faster than in global economy

11 December 2025 - Employment in the energy sector is growing twice as fast as in the overall global economy, but the IEA is warning of a serious shortage of skilled workers in key sectors.