Electricity

Akuo expands hydropower portfolio in Bulgaria

akuo bulgaria hydropower plants pasarel

Pasarel hydropower plant (photo: Akuo)

Published

April 6, 2021

Country

Comments

comments icon

0

Share

Published:

April 6, 2021

Country:

Comments:

comments icon

0

Share

Renewable energy producer Akuo from France has completed the acquisition of PVB Power Bulgaria, a company with five hydropower plants. The combined installed capacity is 15.5 MW.

Akuo Bulgaria now operates power plants with an installed capacity of 78 MW. The French company is very active in Southeastern Europe, with its subsidiaries Akuo Central Europe, based in Zagreb (Croatia), Akuo Energy Greece, Akuo Bulgaria, and Akuo Turkey.

“Akuo has successfully completed the acquisition of PVB Power Bulgaria, a portfolio of five operational hydroelectric plants with a total installed capacity of 15.5 MW. These assets, located on the Iskar river near Svoghe, have been operational since 2010-2013,” the company said on its website.

Akuo Bulgaria increased the capacity of its hydropower plants in Bulgaria to 78 MW

The acquisition of the small hydropower plants allows Akuo to strengthen its hydropower division and its presence in Bulgaria, where the French group already runs four other hydropower plants.

The company noted Bulgaria has set a target of increasing the share of renewable energy in the country’s electricity production to over 30% by 2030.

Renewables are a reliable alternative for aging coal-powered power plants

Bulgaria has a substantial reservoir of renewable energy resources, a well interconnected electricity grid, but also aging coal-powered power stations, for which renewable energy combined with storing solutions offer an economical and reliable alternative, the company said.

Akuo Central Europe has 527 MW of renewable projects in the pipeline

Akuo’s subsidiary Akuo Central Europe, based in Croatia, currently has 181.7 MW in operation, 138 MW under construction, and 527 MW in advanced development, according to the company’s website.

Akuo developed the first wind farm in Montenegro

Akuo Central Europe has developed Krnovo, the first wind farm in Montenegro, and now it is developing the Bašaid wind farm in Serbia. In 2019 the company inaugurated its Energostatik biomass cogeneration plant in Croatia.

Akuo operates solar, biomass, hydropower, and wind power plants with installed capacity of 1.3 GW throughout the world. It has projects in the pipeline with a planned capacity of 5 GW in total.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

sunotec germany hybrid power plant Zerbst

Sunotec advances Germany’s largest EEG hybrid power plant

15 January 2026 - Located on a 41-hectare former gravel pit, the site combines 73,000 solar modules with a capacity of 46.4 MWp and a 57 MWh BESS

DNV acquire Automa Power Utilities digital operations energy

DNV to acquire Automa Power & Utilities, strengthening position as global end-to-end digital operations partner for energy industry

14 January 2026 - DNV agreed to acquire Brazil-based Automa, provider of integrated monitoring, control, and performance management solutions

montenegro epcg masdar agreement spajic djukanovic

EPCG, Masdar sign cooperation agreement

14 January 2026 - Montenegro’s power utility EPCG and UAE-based Masdar today signed a cooperation agreement as part of Abu Dhabi Sustainability Week

bih republic of srpska trebinje wind farm leotar Zhogbo Group

Zhongbo group advances in preparation for construction of Leotar wind park

14 January 2026 - It would be the largest wind power plant in the Western Balkans by capacity and one of the largest in Southeast Europe