Renewables

Abazović says wind farm Možura a priority for high-level corruption council

wind-farm-Montenegro-corruption

Photo: Pixabay/Oimheidi

Published

March 9, 2021

Country

Comments

0

Share

Published:

March 9, 2021

Country:

Comments:

0

Share

Montenegrin Deputy Prime Minister Dritan Abazović has said alleged corruption in connection with the Možura wind farm is one of the priorities for the country’s council for high-level corruption, adding that he will soon start discussions on the case with authorities in Malta.

Speaking on Maltese NET TV together with Mario de Marco, Malta’s shadow finance minister, Abazović said it is of great importance for both Montenegro and Malta to get to the bottom of this case.

The 46 MW Možura wind farm, built by a consortium of Maltese state-owned power utility Enemalta and China’s Shanghai Electric Power Company, was officially put in operation in November 2019, following a EUR 90 million investment. The state had pledged a fixed electricity price of EUR 95.99/MWh and EUR 115 million in incentives over the first 12 years of operation.

Before coming to power, Abazović demanded that the Možura agreement be scrapped

In August 2020, before he came to power, Abazović showed reporters a document which he claimed was proof of corruption in the Možura case, calling on authorities to scrap the agreement, arrest those responsible, and bring the wind farm back into the state’s hands.

Abazović linked the alleged malfeasance in the Možura project to the murder of a Maltese journalist, adding that the project also caused EUR 115 million in damage to Montenegrin taxpayers.

The European Commission also expects investigation into Možura

Maltese investigative journalist Daphne Caruana Galizia was killed by a car bomb in 2017. Her son, who is himself an investigative journalist, told Vijesti last year that his mother’s investigation focused on the then Montenegrin Prime Minister Milo Đukanović, currently the country’s president, as well as the then Maltese prime minister, Joseph Muscat.

In August last year, European Commission spokesperson Ana Pisonero said that the EU executive expected a “credible, independent, and efficient” investigation into allegations of corruption surrounding the Možura wind farm project.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Croatia-HEP-pumped-storage-hydropower-plant-Blaca

Croatia’s HEP preparing to build pumped storage hydropower plant Blaca

06 May 2024 - HEP Group's pumped storage hydropower plant Blaca would have a capacity of 498 MW in turbine mode and 489 MW in pumping mode

rheenergise-high-density-hydro

RheEnergise building waterless hydropower storage facility in UK

06 May 2024 - RheEnergise has developed a technology to use a dense fluid rather than water to store surplus energy from wind and solar power plants

europe flexibility seasonal balancing iea report

Flexibility needs to be met by demand response, batteries, hydrogen, but also thermal, hydropower plants – IEA

03 May 2024 - The report Managing the Seasonal Variability of Electricity Demand and Supply analyzes the situation in Europe, India, and Indonesia

IPTO suspends all electricity imports until May 7 to protect the Greek system

Greece suspends electricity imports until May 7 to protect system

03 May 2024 - The Greek Independent Power Transmission Operator (IPTO) has announced the suspension of all electricity imports during the hours around noon