News

Ministry’s assessment for wind park annulled

Published

January 15, 2016

Comments

comments icon

0

Share

Published:

January 15, 2016

Comments:

comments icon

0

Share

The Administrative Court in Split accepted Association BIOM’s law suit and declared invalid the decision of Croatia’s Ministry of Environmental and Nature Protection to accept the construction of Bila Ploča wind power plant in Pelješac peninsula in the country’s south. This is the first ruling which blocks a project in an area significant for bird protection as it has been determined that the environmental impact assessment study was unfounded, BIOM said. According to its press release, studies have been produced unprofessionally for years, including findings related to the Natura 2000 network.

The process was initiated by the association and the Croatian Society for Bird and Nature Protection three years ago and the court issued the ruling on December 28. The situation with the study was absurd as state institutions had identified the area as significant for bird protection on an international level, said Vedran Lucić, spokesman of BIOM, and added that bad positioning of wind power plants can cause high mortality of birds and bats, as they collide with turbine blades.

Unfounded studies are the consequence of direct deals between investors and producers of the document, and the ministry tolerates actions against protected species and habitats in Croatia, the press release said. BIOM has three more pending law suits related to bird protection, for wind parks in the mountains of Dinara and Velebit.

Related Articles

KEY The Energy Transition Expo energy hub becomes increasingly global

KEY – The Energy Transition Expo: the energy hub becomes increasingly global

10 February 2026 - Of the over 1,000 brands exhibiting at Italian Exhibition Group’s energy transition event, to be held from March 4 to 6 at Rimini Expo Centre, about 32% will be foreign

electricity iea demand power lines

IEA: Renewables and nuclear set to supply 50% of world’s electricity by 2030 as demand rises steadily

09 February 2026 - Renewables, gas, and nuclear power will meet all additional electricity demand, while output from coal will decline and CO2 emissions stagnate

Protests giant hybrid power plant Bulgaria loss of land Green Source

Protests against giant hybrid power plant project in Bulgaria over loss of land

09 February 2026 - Environmentalists and locals are opposing a EUR 450 million solar power and battery project in Suhindol in Bulgaria

CWP Europe commissions Romania largest solar park

CWP Europe commissions Romania’s largest solar park

09 February 2026 - Solar power plant Studina, the largest in Romania at 174 MW in peak capacity, has entered regular operation