Energy Efficiency

Serbian building firm on path to green growth with new high-efficiency equipment

building green growth high-efficiency equipment

Photo: GEFF Serbia Leasing

Published

August 25, 2020

Country

Comments

comments icon

0

Share

Published:

August 25, 2020

Country:

Comments:

comments icon

0

Share

Serbian construction company Karin Komerc MD has taken a significant step towards green growth by investing in new, high-efficiency equipment. The achieved cuts in energy and water consumption, reduced CO2 emissions, as well as financial savings, demonstrate the great potential of the construction industry to reduce its environmental footprint and take an active role in combating climate change.

Novi Sad-based Karin Komerc MD has recently bought state-of-the-art, high-efficiency equipment for gravel and sand separation, a EUR 289,700 investment financed through GEFF Serbia Leasing, part of the European Bank for Reconstruction and Development’s (EBRD) global Green Economy Financing Facility (GEFF) program. The funding was disbursed by UniCredit Leasing Serbia, a partner financial institution of GEFF Serbia Leasing.

The investment will help cut CO2 emissions by 16.8 tons a year

Karin Komerc MD’s new Binder+Co machine for gravel and sand separation will allow the company to reduce electricity consumption by 22.5%, or 100.6 MWh a year, cut water use by 34%, or 190,809 cubic meters a year, and avoid emitting some 16.8 metric tons of CO2 annually. At the same time, the investment will save the company over EUR 33,000 each year in reduced fuel and maintenance costs.

The new separation line is the first in Serbia based on the DiviTec technology

The new separation line is based on the so-called DiviTec technology, and Karin Komerc MD is the first company in Serbia to introduce it. This technology means the machine is lighter in weight as well as more efficient in the separation process. The efficiency rate of the new machine is 95%, compared with the previous one’s 85%.

Karin-Komerc-MD-worker-supervizing-new-gravel-and-sand-separation-line
Karin Komerc MD worker supervising operations of  high-efficiency Binder+CO gravel and sand separation line

The company, established in the Novi Sad suburb of Veternik in 2005 and employing some 500 people, operates in all segments of construction business: civil engineering (mostly road construction), hydraulic construction, and building construction, while another important element of its business is the production and sale of concrete and the extraction and separation of gravel and sand.

Karin Komerc MD – a Serbian company doing business in line with sustainable development agenda

A good example of a domestic company doing business in line with principles of green and sustainable development, Karin Komerc MD has recently used its own funds to replace its older generation trucks with new, more modern vehicles with Euro 6 engines, which reduce emissions of harmful exhaust gases.

The GEFF Serbia Leasing was developed by the EBRD and is supported by the Green Climate Fund and the Government of Luxembourg. The EBRD’s global GEFF program operates through a network of 140 financial institutions across 26 countries, and is supported by nearly EUR 4 billion of EBRD finance.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

data center ai digitalization energy eu roadmap

EU preparing roadmap on digitalization, AI in energy

19 August 2025 - The European Commission has launched a public consultation on a roadmap for digitalization and AI in the energy sector.

Heat pump sales in Europe fell dramatically in 2024

Heat pump sales in Europe plunge in 2024

15 August 2025 - The EU wants to reach 60 million heat pumps by 2030, but sales in major European markets fell 22% in 2024

EU donates EUR 240 million to Serbia for environment energy efficiency

EU donates EUR 240 million to Serbia for environment, energy efficiency

07 August 2025 - The EU approved EUR 240 million in non-repayable assistance to Serbia from IPA funds for projects worth an overall EUR 325.2 million

croatia vireas agency north AI energy

Meet VIREAS: new AI-powered virtual assistant for energy

22 July 2025 - The VIREAS app is an interactive platform that enables users to engage with an AI assistant on various topics related to energy