Renewables

Megajoule Adria to conduct wind resource assessment for Poklečani wind farm

Megajoule-Adria-to-conduct-wind-resource-assessment-for-Poklecani-wind-farm

Photo: Pixabay

Published

April 13, 2020

Comments

comments icon

0

Share

Published:

April 13, 2020

Comments:

comments icon

0

Share

Power utility Elektroprivreda Hrvatske Zajednice Herceg Bosne (EPHZHB) has selected Zagreb-based Megajoule Adria to prepare a study on a wind resource assessment for the Poklečani wind farm.

According to the EPHZHB, Megajoule Adria has offered to conduct a wind resource assessment for BAM 12,500 (about EUR 6,400).

A public invitation to prepare the study was launched in June last year, with a deadline for submitting bids by July. However, the deadline was extended to the end of August.

Megajoule Adria got the job after it filed a complaint, because initially its offer was assessed as irregular

At the end of January, EPHZHB decided to award the contract to the consortium the University of Mostar and Energy Institute Hrvoje Požar. Megajoule Adria was the only other bidder.

The university and the institute have bid BAM 21,800 (around EUR 11,150), while Megajoule Adria’s offer was rejected with the argument that it didn’t comply with the tendering requirements.

EPHZHB was awarded a concession to build and operate the Poklečani wind farm in June 2014

However, after Megajoule Adria filed a complaint, EPHZHB changed its decision and selected it instead.

In June 2014, EPHZHB was awarded a concession to build and operate the Poklečani wind farm. The concessionaire is to build wind turbines of 5 MW each on up to 36 locations.

EPHZHB recently launched a tendering procedure for the maintenance of the Mesihovina wind farm, the first in BiH.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

CJR Renewables 102 MW Urleasca wind farm Romania

CJR Renewables completes construction of 102 MW Urleasca wind farm in Romania

09 October 2025 - The Urleasca wind farm in Brăila county in eastern Romania is complete, contractor CJR Renewables said

slovenia coal phaseout coal mine velenje golob robert visit

Slovenia begins preparations for closure of Velenje coal mine

09 October 2025 - Slovenian Prime Minister Robert Golob visited the Velenje coal mine to present a draft law on its gradual closure

Metlen Karatzis Greece largest battery joint venture

Karatzis, Metlen to install Greece’s largest battery in joint venture

09 October 2025 - Metlen and Karatzis Group of Companies are establishing a joint venture for a standalone BESS of 330 MW and 790 MWh

world dnv energy transition energy transition outlook 2025

Policy changes in US will have marginal impact on global energy transition

09 October 2025 - AI energy use may seem alarming, but it is projected to stay below EV charging and the cooling of buildings, DNV calculated