Energy Efficiency

Construction of new CHP plant in Zenica starts, completion expected by end of 2020 

Zenica

Photo: ArcelorMittal Zenica

Published

March 3, 2020

Comments

comments icon

0

Share

Published:

March 3, 2020

Comments:

comments icon

0

Share

New combined heat and power (CHP) plant Toplana Zenica, expected to start operation in 2021, will eliminate the use of coal for district heating and utilize waste gases from the ArcelorMittal Zenica steel plant, it was said during the official start of the construction works in the town in central Bosnia and Herzegovina.

The CHP plant will have a power output of 14.45 MW and a heat capacity of 112.5 MW.

ArcelorMittal Zenica CEO Nikhil Mehta said the construction works are expected to be finished by the end of 2020.

New CHP facility will not use coal, which translates to the complete elimination of SO2 emissions

It means the new CHP facility will not use coal in its boilers, which translates to the complete elimination of SO2 emissions and a more stable supply of heat to consumers, he said.

Zenica is one of the cities with the most polluted air in the region.

The CHP plant is being built by joint venture established by ArcelorMittal Zenica, the City of Zenica, KPA Unicon , and Finnfund

According to an earlier statement by BiH’s Federal Environment and Tourism Minister Edita Đapo, the EUR 53 million project will reduce SO2 emissions by 70% from current levels.

The CHP plant is being built by joint venture Toplana Zenica, established by ArcelorMittal Zenica (50%), the City of Zenica (20%), Finland’s clean energy solutions provider KPA Unicon (15%), and Finnfund, a Finnish development financier (15%).

The city didn’t have to take a loan for this investment

The financing agreement for the facility was signed in March last year. The EUR 46 million package was secured by the European Bank for Reconstruction and Development (EBRD).

Zenica Mayor Fuad Kasumović said it is very important the city didn’t have to take a loan for this investment.

The city secured only BAM 4.7 million (EUR 2.4 million) as a founding stake in the business, he said.

CO2 emissions will be lowered by 200,000 tonnes – EBRD

The cogeneration facility will supplement the steam and blast air that are currently made in the steelworks, EBRD said. The plan is also to take over district heating for the city from ArcelorMittal Zenica, the bank added on its website.

Coal-based steam generators with the best available techniques will be installed

The investment includes the replacement of all outdated, coal-based steam generators with the best available techniques, fully using recovery gases from the steelworks and natural gas as a backup fuel.

The waste gasses from the steel plant are currently flared or inefficiently used. The estimated CO2 savings are 200,000 tonnes per annum.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

montenegro energy efficiency eu directive energy saving

Montenegro to introduce zero-emission buildings, mandatory energy savings in public sector

02 April 2026 - The government adopted the roadmap for the transposition of the EPBD and EED directives, and the adoption of the National Building Renovation Plan

north macedonia energy renovation public buildings afd giz bozinovska

North Macedonia to invest EUR 50 million in energy renovation of public buildings

31 March 2026 - The Ministry of Energy, Mining and Mineral Resources started preparations for investments in the energy renovation of public buildings

Decarbonising multi-family buildings, the solutions are here

Decarbonising multi-family buildings: the solutions are here

30 March 2026 - Solutions for decarbonising multi-family buildings already exist, from heat pumps to modernised district heating, but wider deployment will require a clearer and faster regulatory framework.

serbia world bank loan gas pipelines energy efficiency subsidies dubravka djedovic gil pontara

Serbia negotiating loan to finance gas pipelines, energy efficiency

27 March 2026 - The Government of Serbia is discussing a new program to finance the construction of gas pipelines and subsidize energy efficiency measures