News

Belgrade’s power distribution replacing 20,000 meters

Published

November 25, 2015

Comments

comments icon

0

Share

Published:

November 25, 2015

Comments:

comments icon

0

Share

The procedure of receiving offers is being completed on November 26 for the installation of 20,000 power meters in Belgrade through a public call. EPS distribucija, the public operator, changed the terms since publishing the need for 25,000 single- and three-phase devices, while Feman d. o. o. from Jagodina, one of the potential bidders, filed for rights protection.

The open procedure has the lowest price as the main criterium, and a longer warrant as the secondary rule. The documents show the decision is to be made within 25 days from the opening of offers. The procurement, filed as 253/2014, includes a participation fee of RSD 80,000 (EUR 663) for an offer of up to EUR 663.000, or 0.1% of the price if it is bigger than that sum.

State-owned utility EPS is using an EUR 80 million loan from the European Bank for Reconstruction and Development and the European Investment Bank for procurement within the EPS Metering project.

 

Related Articles

masdar socar green solar power projects azerbaijan

Masdar, SOCAR join forces on 760 MW of solar in Azerbaijan

23 November 2024 - Masdar and SOCAR Green have reached financial close for the 445 MW Bilasuvar and 315 MW Neftchala solar projects in Azerbaijan

wind farm ljubusa tomislavgrad

Concession signed for 80 MW wind farm in Tomislavgrad

22 November 2024 - Alpha Wind has been granted a concession to build the 80 MW Ljubuša wind farm in the municipality of Tomislavgrad.

zagreb waste management center tomasevic

Zagreb picks technological solution for city’s waste management system

22 November 2024 - The city has selected technological solution C, one of three proposed, based on an analysis of municipal waste processing technologies

Dentons advises EnergoNuclear EPCM deal Cernavoda

Dentons advises EnergoNuclear on EPCM deal for Cernavodă project

22 November 2024 - Dentons advised EnergoNuclear on an engineering, procurement, and construction management (EPCM) contract for Cernavodă 3 and 4