News

LM Wind Power’s plant in Bergama produces 500th blade

Bergama 500th blade

Photo: LM Wind Power

Published

August 23, 2019

Country

Comments

comments icon

0

Share

Published:

August 23, 2019

Country:

Comments:

comments icon

0

Share

Wind turbine blade designer and manufacturer LM Wind Power, a GE Renewable Energy business, has produced the 500th blade at its Bergama, Turkey plant since the facility opened two years ago.

“Devoted to responding to the growing demand for wind energy worldwide – including in Turkey, Europe and Asia – the 500 blades produced so far in Bergama are meant to capture the wind for a total capacity of about 500 MW. That’s enough blades to power the equivalent of around 680,000 homes in Turkey!,” reads a press release from LM Wind Power.

Inaugurated in July 2017, the Bergama facility became the 15th LM Wind Power factory and the first opened after the company became a GE Renewable Energy business. “The Bergama factory represents a USD 50 million commitment to Turkey, and in 2019, we decided to invest another USD 30 million by the end of the year to extend the facility and recruit 300 new employees,” LM Wind Power said.

The 500 blades produced so far in Bergama are meant to capture the wind for a total capacity of about 500 MW

Today, the Bergama site counts 450 employees, 26% of whom are women, and it will reach more than 700 employees in 2020.

For updates on the hiring process, visit Balkan Green Energy News’ Jobs page.

Approximately 95% of new hiring is blue-collar workers and the remaining 5% is primarily engineering positions.

“We are seeking employees working in the field of grinding and composite materials who have used manual skills in their previous work. After employees start to work, they will receive training in our ‘Center of Excellence’ in a six-week training course consisting of fix modules. In addition to engineering positions, we prefer industrial and mechanical engineers,” the company said earlier in an emailed statement to Balkan Green Energy News.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

ems ai transmission

Serbia’s TSO EMS plans to use AI in construction approvals

21 November 2024 - EMS has decided to automate its construction approval procedure by introducing state-of-the-art AI solutions

IPTO ENCS cybersecurity grid

Greece’s IPTO joins European Network for Cyber Security

21 November 2024 - The European Network for Cyber Security (ENCS) has announced that IPTO has officially joined the network as a full member

montenegro gvozd epcg nordex Ibrahim Özarslan

Montenegro’s power utility EPCG begins construction of Gvozd wind farm

21 November 2024 - Wind farm Gvozd will be the first large-scale power generation facility to be built by EPCG in more than 40 years

Bulgarian waterworks firm installs in pipe hydropower generator

Bulgarian waterworks firm installs in-pipe hydropower generator

21 November 2024 - A waterworks and sewerage firm in Bulgaria produces electricity using an in-pipe hydropower device in a supply line