News

LM Wind Power’s plant in Bergama produces 500th blade

Bergama 500th blade

Photo: LM Wind Power

Published

August 23, 2019

Country

Comments

comments icon

0

Share

Published:

August 23, 2019

Country:

Comments:

comments icon

0

Share

Wind turbine blade designer and manufacturer LM Wind Power, a GE Renewable Energy business, has produced the 500th blade at its Bergama, Turkey plant since the facility opened two years ago.

“Devoted to responding to the growing demand for wind energy worldwide – including in Turkey, Europe and Asia – the 500 blades produced so far in Bergama are meant to capture the wind for a total capacity of about 500 MW. That’s enough blades to power the equivalent of around 680,000 homes in Turkey!,” reads a press release from LM Wind Power.

Inaugurated in July 2017, the Bergama facility became the 15th LM Wind Power factory and the first opened after the company became a GE Renewable Energy business. “The Bergama factory represents a USD 50 million commitment to Turkey, and in 2019, we decided to invest another USD 30 million by the end of the year to extend the facility and recruit 300 new employees,” LM Wind Power said.

The 500 blades produced so far in Bergama are meant to capture the wind for a total capacity of about 500 MW

Today, the Bergama site counts 450 employees, 26% of whom are women, and it will reach more than 700 employees in 2020.

For updates on the hiring process, visit Balkan Green Energy News’ Jobs page.

Approximately 95% of new hiring is blue-collar workers and the remaining 5% is primarily engineering positions.

“We are seeking employees working in the field of grinding and composite materials who have used manual skills in their previous work. After employees start to work, they will receive training in our ‘Center of Excellence’ in a six-week training course consisting of fix modules. In addition to engineering positions, we prefer industrial and mechanical engineers,” the company said earlier in an emailed statement to Balkan Green Energy News.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Belgrade Energy Forum BEF 2026 leaders of energy transition convening in Serbia s capital on May 11 12

Belgrade Energy Forum 2026 – leaders of energy transition convening in Serbia’s capital on May 11-12

04 March 2026 - Balkan Green Energy News has scheduled its Belgrade Energy Forum 2026 for May 11-12. As many as 500 participants are expected for the fourth edition of SEE's premier B2B and B2G energy conference.

slovenia subsidies prosumers solar batteries borzen

New EUR 30 million in subsidies for Slovenian prosumers

03 March 2026 - The funds are intended for legal entities, and the subsidy scheme will be implemented by electricity market operator Borzen

eu entsog report biomethane renewable gas injections

ENTSOG: Renewable gas injections in EU grids increase 12%

03 March 2026 - The European Network of Transmission System Operators for Gas has published its report on annual renewable gas injections into gas networks

Geothermal district heating EUR 200 million Bucharest Green Tech International

Geothermal district heating investment worth EUR 200 million starts in Bucharest

03 March 2026 - Romania-based Green Tech International declared the start of implementation of a geothermal district heating project in the northern part of Bucharest