Electricity

TENDERING: Study on economic impact of climate change on Trebišnjica hydrosystem

Photo: HPP Trebinje 1 (HET)

Published

July 5, 2019

Comments

comments icon

0

Share

Published:

July 5, 2019

Comments:

comments icon

0

Share

The United Nations Development Programme (UNDP) in Bosnia and Herzegovina has launched tendering for the development of study on the economic impact of climate change on the hydropower sector in Republika Srpska – the multipurpose hydrosystem Trebišnjica.

The deadline to file bid expires on July 25.

The UNDP in BiH is implementing the National Adaptation Plan (NAP), funded by the Green Climate Facility (GCF), and the development of a study on the economic impact of climate change on the hydropower sector in Republika Srpska – the multipurpose hydrosystem Trebišnjica in BiH is envisaged, the procurement notice reads.

The key objectives of the study are to analyze the climate change impact on the current state of development of the hydropower system and its efficiency. It is necessary to analyze the planned elimination of negative impacts in the current state and estimate the achievements for the current degree of development, the request for proposal reads.

According to the document, following the analysis of the current state, it is necessary to carry out an analysis of the ‘to-be’ state, i.e. the planned expansion of the Trebišnjica hydropower system in the planned state (the key facilities of the system that are missing – HPP Nevesinje, HPP Dabar, HPP Bileća and HPP Dubrovnik 2) as an alternative in combating climate change.

The facilities of the hydropower plant system on Trebišnjica are now used by power utility Elektroprivreda Republike Srpske (ERS) – HPP Trebinje 1 and HPP Trebinje 2, as well as one generator in HPP Dubrovnik G2, Elektroprivreda Herceg-Bosne (EPHZHB) – HPP Čapljina, and Hrvatska Elektroprivreda (HEP) – one generator in HPP Dubrovnik. The three companies are from two states, BiH and Croatia, including two from different entities of BiH.

Tendering for HPP Dabar underway

Power utility Elektroprivreda Republike Srpske (ERS) intends to build the 160 MW HPP Dabar. The tendering procedure for this project is in progress. In November 2018, ERS  selected a consortium led by AF-Consult Switzerland Ltd. to provide advisory services in the process of awarding a turnkey/engineering, procurement, and construction (EPC) contract.

The multipurpose system of Trebišnjica, as an integrated development project, is a system with a very complex configuration, which is under gradual development.

The expansion of its current configuration is planned to the so-called Gornji Horizonti zone.

The current configuration of the system includes reservoirs of Bilećko Lake and Trebinje, as well as HPPs Trebinje 1, Trebinje 2, Dubrovnik 1 and Čapljina.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

RatedPower webinar Power the Balkans optimizing solar and BESS with RatedPower

Webinar summary: How to design PV and BESS in the Balkans faster and smarter with RatedPower software

25 October 2025 - RatedPower has organized a webinar to present its software that makes it faster and easier to design and build PV and battery storage facilities

EU Romania delay shutdown coal plants end 2029

EU allows Romania to delay shutdown of coal plants until end-2029

24 October 2025 - Amid delays in gas power projects, the European Commission approved Romania's request to push back the closure of several coal-fired systems

eu commission russian gas ban serbia bih transit bulgaria Anna-Kaisa-Itkonen

European Commission: Russian gas ban doesn’t include transit to Serbia, BiH

24 October 2025 - Balkan Green Energy News asked the European Commission to clarify if the supply of Russian gas to Serbia and BiH would be halted as of January 1, 2026

Romania call additional wind power auction 290 MW

Romania issues call for additional wind power auction for 290 MW

24 October 2025 - Wind farm project developers in Romania can bid by November 24 for state aid in the form of contracts for difference – CfDs