Environment

Ugljevik 3 power plant project not to use approved environmental permit

Photo: ERS

Published

November 30, 2018

Comments

comments icon

0

Share

Published:

November 30, 2018

Comments:

comments icon

0

Share

Bosnia and Herzegovina committed not to use the environmental permit issued as a result of the non-compliant environmental impact assessment procedure of the planned 600 MW Ugljevik 3 thermal power plant (TPP) in Republika Srpska, the Energy Community (EnC) Secretariat said in a press release.

The commitment came as a result of mediation conducted under the auspices of the EnC Secretariat’s Dispute Resolution Centre.

The coal-fired power plant is to be constructed by Comsar Energy Group near the existing power plant Ugljevik 1. After receiving a complaint, in July 2017 the Secretariat initiated a dispute settlement procedure claiming that the permitting procedure of the planned TPP Ugljevik 3 failed to comply with the provisions of the Environmental Impact Assessment Directive.

According to the Secretariat, the settlement agreement was signed before the EnC’s Ministerial Council, held yesterday in Skopje.

“BiH committed, with the agreement of the investor, Comsar Energy Republika Srpska Ltd. Banja Luka, not to use the environmental permit issued as a result of the non-compliant environmental impact assessment procedure,” the Secretariat’s press release reads.

The investor has the possibility to initiate a new environmental impact assessment procedure, which will be completed with the support of the Secretariat.

The Ministerial Council was due to take a decision in this case, but the Secretariat withdrew the case from the agenda of the meeting.

Tuzla 7 power plant is a new problem

TPP Ugljevik 3 is not the only coal project which is causing problems in relations between BiH and the Secretariat.

In October, after receiving a complaint, the Secretariat sent a letter to the Parliament of the Federation of Bosnia and Herzegovina (FBiH) in which it raised serious doubts about the State Aid Council decision to back the BiH authorities’ decision to approve a state guarantee for the EUR 614 million loan to state-owned power utility Elektroprivreda BiH (EPBiH) for the Tuzla 7 project.

The State Aid Council responded that its decision is in line with the BiH and EU state aid regulations.

Public power utility Elektroprivreda Bosne i Hercegovine (EPBiH) has signed a loan agreement for financing the construction of a 450 MW coal-fired unit 7 in TPP Tuzla. The project is worth EUR 722  million.

4 coal-fired power plants in the pipeline

BiH gets more than half of its electricity from hydropower plants, but the rest comes from 5 plants powered by lignite, while the country plans to build 4 more – Ugljevik 3, Tuzla 7, Gacko 2, and Kamengrad. Except Ugljevik 3, all the other will be built with loans and construction companies from China.

Public power utility Elektroprivreda Republike Srpske (ERS) has set up a joint venture to build a 350 MW coal-fired power plant Gacko 2 with two Chinese companies.

The project Mining and Thermal Power Plant Kamengrad has so far been backed by a memorandum signed by China Energy Group and private company Lager Ltd Posušje.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

serbia germany franziska brantner lithium jadar rio tinto china

Question isn’t whether lithium in Serbia will be mined or not, but who will do it – Brantner

13 August 2024 - In an interview, Franziska Brantner said lithium is among raw materials necessary for climate action

Protesters Serbia block railway campaign to ban lithium mining

Protesters in Serbia block railway in campaign to ban lithium mining

11 August 2024 - A series of almost everyday protests for weeks throughout Serbia against lithium mining culminated in a massive rally in Belgrade

montenegro waste incineration energy podgorica deponija landfill

Waste-to-energy is win-win solution for Podgorica landfill – minister

09 August 2024 - Municipal waste management utility Deponija in Podgorica plans to build a waste-to-energy facility, its director Aleksandar Božović said

Revised Greek NECP aims at lower cost, high renewable penetration

Revised Greek NECP halves initial expenditure sum, keeps focus on renewables

09 August 2024 - Greece aims at a less costly and more realistic energy transition through its revised National Energy and Climate Plan (NECP)