Environment

World’s first bike path made from recycled plastic opens in Netherlands

Photo: PlasticRoad.eu

Published

November 23, 2018

Country

Comments

comments icon

0

Share

Published:

November 23, 2018

Country:

Comments:

comments icon

0

Share

The world’s first PlasticRoad bike path opened recently in Zwolle, the Netherlands. Made from recycled plastic, the PlasticRoad is a completely circular product, with a significantly smaller carbon footprint than traditional road structures thanks to the longer lifespan and the reduction of transport movements involved in its construction, according to developers – Dutch firms KWS and Wavin and France’s Total.

The first PlasticRoad in the world was unveiled on September 11. It is a 30-meter bike path containing recycled plastic equivalent to more than 218,000 plastic cups or 500,000 plastic bottle caps. The pilot location is equipped with sensors to monitor the road’s performance – including temperature, the number of bike passages, and the durability of the road. With these sensors, this PlasticRoad is the first smart bike path in the world.

A second pilot PlasticRoad bike path is expected to be installed by the end of 2018, also in the Netherlands, in the town of Giethoorn.

High-value second life for plastic waste

Worldwide, 350 million tons of plastic are used every year and the largest portion of plastic reaching end-of-life is still landfilled or incinerated, and the PlasticRoad creates a high-value second life for plastic waste by recycling it and using it to build roads. The end goal is to use 100% recycled plastic in the production of the PlasticRoad, according to the developers.

In addition to a possible solution for waste plastic, the PlasticRoad is a way to build roads faster, with less impact on the surroundings and with less CO2 emissions. The prefab, modular elements make this possible and the hollow construction offers a solution for improved water drainage in the case of heavy rain fall.

Market leaders join forces for a circular solution

KWS is the market leader in road construction and the production of asphalt in the Netherlands. The market requirements in terms of noise reduction, flooding, longevity, and sustainability inspired the idea of the PlasticRoad, according to the project’s website.

As a market leader in the recycling of plastic, Wavin is the perfect partner to introduce its knowledge and experience in the field to the project. Another added value of Wavin in this collaboration is their specialization in making plastic products for rainwater drainage.

Total has extensive knowledge in the field of plastics as well. The company makes important contributions to the project with regards to improving the properties of plastics, the recycling of plastics and the available production techniques, according to the project’s website.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

montenegro france afd loan spajic vukovic

Montenegro signs EUR 50 million loan agreement with France’s AFD

20 November 2024 - AFD will support Montenegro's reforms in waste management, renewable energy, sustainable forestry, and climate action

romania coal mines closure Jiu Valley

Romania gets nod for EUR 790 million in aid for coal mine closure

18 November 2024 - The coal mines are located in the Jiu Valley, Romania’s main coal region and one of the 20 coal regions in the European Union

Vucic Serbia wants Azerbaijan participate major gas power project

Vučić: Serbia wants Azerbaijan to participate in major gas power project

13 November 2024 - Serbian President Aleksandar Vučić said the government is starting talks with Azerbaijan to build a 1 GW gas power plant or two smaller ones

Landmark deal reached at COP29 on global carbon market

Landmark deal reached at COP29 on global carbon market

12 November 2024 - Countries participating in COP29 reached a consensus on standards for the creation of carbon credits in line with the 2015 Paris Agreement