Renewables

KfW signs EUR 1.1 million financing agreement to help prepare Bitovnja wind farm project

Photo: Pixabay

Published

September 4, 2018

Comments

comments icon

0

Share

Published:

September 4, 2018

Comments:

comments icon

0

Share

German development bank KfW and public power utility Elektroprivreda BiH (EPBiH) have signed a EUR 1.1 million financing agreement for the preparation of the Bitovnja wind farm project, one of the key renewable energy facilities envisaged to be built under the company’s long-term development plan, according to a media release from EPBiH.

The funding for the preparation of the Bitovnja wind farm is being provided in the form of a grant by the German government, through KfW, as part of its development aid for Bosnia and Herzegovina (BiH).

The preparation for the Bitovnja wind farm project includes additional measurements of wind power potential, a bankable feasibility study, geotechnical research, an environmental and social impact study, as well as a feasibility study, according to the press release.

The future wind farm, located in the Konjic municipality about 30 kilometers west of the capital Sarajevo, is planned to have up to 25 wind turbines, with a combined installed capacity of up to 60 MW, depending on the type of turbines.

According to estimates so far, the Bitovnja wind farm could generate at least 110 GWh of electricity a year. Measurements of wind energy potential for the Bitovnja wind farm have been conducted since 2010, with all research performed in line with the highest standards and guidelines used in the EU in the field of wind power, according to the statement.

The financing agreement was signed in Sarajevo on August 27 by EPBiH General Manager Bajazit Jašarević and Executive Director for Economic Affairs Muhamed Ražanica, KfW Regional Manager for Southeast Europe and Turkey Constanze Kreiss, and Matthias Schmidt-Rosen, director of KfW’s office in BiH.

KfW is also financing the Podveležje wind farm with 15 turbines, which will be built 10 kilometers east of the city of Mostar in southern BiH, EPBiH recalled.

According to previous reports, KfW has provided a EUR 65 million loan and a EUR 400,000 grant for the Podveležje wind farm, while the rest of the funding for the EUR 81 million project is to be secured by EPBiH.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

CWP Europe and the European Commission signed the Declaration

CWP Europe gets European Commission’s backing for renewables projects in Albania, Montenegro

13 October 2025 - CWP Europe and the European Commission have signed a declaration of support for the Tropoja wind farm and the Montechevo solar farm with battery storage

IPS International Power Supply inaugurates Bulgaria first battery gigafactory

International Power Supply inaugurates Bulgaria’s first battery gigafactory

13 October 2025 - International Power Supply (IPS) opened its Factory X1 on the outskirts of Sofia, with a capacity of 3 GWh per year

ie energy bess smart battery storage

Croatian IE-Energy, Slovenia’s NGEN plan virtual network of smart battery storage systems

10 October 2025 - The EUR 60 million project is a step toward creating a virtual network of battery storage systems connecting renewable energy producers and consumers.

bih republic of srpska cbam petar djokic

Đokić: We expect EU to accept request to postpone CBAM implementation

10 October 2025 - Minister of Energy and Mining of the Republic of Srpska expressed belief that the European Commission would postpone the implementation CBAM