Electricity

CEDIS to invest EUR 81.6 million in distribution network, tendering expected by end-October

Photo: CEDIS

Published

August 7, 2018

Country

Comments

comments icon

0

Share

Published:

August 7, 2018

Country:

Comments:

comments icon

0

Share

Tendering for the selection of equipment suppliers and contractors for a project worth EUR 81.6 million to revitalize the Montenegrin power distribution network is expected by the end of October, while the start of the works is planned for February next year.

The investments will be implemented by the Montenegrin distribution system operator (DSO), Crnogorski elektrodistributivni sistem (CEDIS), 100% owned by power utility Elektroprivreda Crne Gore (EPCG).

The program for the revitalization of medium and low voltage overhead distribution network anticipates an investment of EUR 81.6 million over three years, which is about four times higher compared to the previous multi-annual average investment in these facilities, according to a document on intensive revitalization of the distribution network, adopted by the Montenegrin government. Nearly 60% of the investments are destined for the northern parts of the country.

In 2019, about EUR 32.3 million is to be invested, in 2020 EUR 27 million, and in 2021 EUR 22.3 million. The largest chunk, EUR 32.5 million, is to be spent on the medium and low voltage network, with EUR 29 million planned for the secondary network, EUR 12 million for the primary network, EUR 3.7 million for measuring infrastructure, EUR 2.3 million for other investments, and EUR 2.1 million for other capital assets.

In order to successfully implement the plan, CEDIS intends to employ a young workforce because it currently lacks staff. This, according to the document, would contribute to a faster realization of the set goals.

If all the preconditions for a successful implementation of the program are met, CEDIS plans to announce a public call for the procurement of goods and services by the end of October, while works could start at the beginning of February 2019.

Minister of Economy Dragica Sekulić said that the EUR 81.6 investment will not lead to an increase in electricity distribution tariffs.

The intention is to use these funds in order to employ domestic companies and workers during program implementation, Sekulić said.

As an independent company, CEDIS was founded as a spin-off of the parent company, EPCG, in June 2016. The company distributes electricity to 370,000 consumers in Montenegro and employs more than 1,300 workers.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

ems ai transmission

Serbia’s TSO EMS plans to use AI in construction approvals

21 November 2024 - EMS has decided to automate its construction approval procedure by introducing state-of-the-art AI solutions

IPTO ENCS cybersecurity grid

Greece’s IPTO joins European Network for Cyber Security

21 November 2024 - The European Network for Cyber Security (ENCS) has announced that IPTO has officially joined the network as a full member

montenegro gvozd epcg nordex Ibrahim Özarslan

Montenegro’s power utility EPCG begins construction of Gvozd wind farm

21 November 2024 - Wind farm Gvozd will be the first large-scale power generation facility to be built by EPCG in more than 40 years

Bulgarian waterworks firm installs in pipe hydropower generator

Bulgarian waterworks firm installs in-pipe hydropower generator

21 November 2024 - A waterworks and sewerage firm in Bulgaria produces electricity using an in-pipe hydropower device in a supply line