Environment

European Environment Agency to assist Energy Community on reporting of emissions from large combustion plants

Photo: Pixabay

Published

March 21, 2018

Country

Comments

comments icon

0

Share

Published:

March 21, 2018

Country:

Comments:

comments icon

0

Share

Energy Community Secretariat will cooperate with European Environment Agency on the Contracting Parties’ obligation to report on emissions of large combustion plants.

“The European Environment Agency has agreed for the Secretariat to make use of its tools for the reporting and assessment of data submitted by the Contracting Parties,” the Energy Community Secretariat said in a statement.

On 1 January 2018, the implementation of the Directive 2001/80/EC on the limitation of emissions of certain pollutants into the air from large combustion plants (LCPD) started in the Energy Community.

The Directive determines the type of applicable combustion plans, the measures to reduce the emissions, including the respective deadlines.

Albania, Bosnia and Herzegovina, Kosovo*, Former Yugoslav Republic of Macedonia, Georgia, Moldova, Montenegro, Serbia and Ukraine as Contracting Parties are obligated to reduce fossil fuel-fired power plants emissions’ of sulfur dioxide, nitrogen oxides and dust.

Under the Directive operators as well as the Contracting Parties must monitor the emissions of these pollutants and report those to the Secretariat.

The Directive applies to combustion plants with a rated thermal input equal to or greater than 50 MW.

As Director of the Energy Community Secretariat Janez Kopač earlier said the first reporting will be due when the data for the year 2018 becomes available, i.e. at the beginning of 2019.

* This designation is without prejudice to positions on status and is in line with UNSCR 1244/99 and the ICJ Opinion on the Kosovo declaration of independence.
Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

sunotec germany hybrid power plant Zerbst

Sunotec advances Germany’s largest EEG hybrid power plant

15 January 2026 - Located on a 41-hectare former gravel pit, the site combines 73,000 solar modules with a capacity of 46.4 MWp and a 57 MWh BESS

DNV acquire Automa Power Utilities digital operations energy

DNV to acquire Automa Power & Utilities, strengthening position as global end-to-end digital operations partner for energy industry

14 January 2026 - DNV agreed to acquire Brazil-based Automa, provider of integrated monitoring, control, and performance management solutions

montenegro epcg masdar agreement spajic djukanovic

EPCG, Masdar sign cooperation agreement

14 January 2026 - Montenegro’s power utility EPCG and UAE-based Masdar today signed a cooperation agreement as part of Abu Dhabi Sustainability Week

bih republic of srpska trebinje wind farm leotar Zhogbo Group

Zhongbo group advances in preparation for construction of Leotar wind park

14 January 2026 - It would be the largest wind power plant in the Western Balkans by capacity and one of the largest in Southeast Europe