Energy Efficiency

Electrica to invest EUR 190 million in energy efficiency and quality of services

Photo:Pixabay

Published

February 8, 2018

Country

Comments

comments icon

0

Share

Published:

February 8, 2018

Country:

Comments:

comments icon

0

Share

Electrica Group, leader in electricity distribution and supply in Romania, has announced its plan to invest over EUR 190 million (RON 900 million) this year in rehabilitation and upgrade of the distribution networks.

The goal of this year record investment is to increase the quality of service by 40 percent and energy efficiency and to reduce network losses by 40 percent, reads the statement at the Electrica’s website.

Electrica Group has been continuously investing in infrastructure. Last year, for example, the total amount of investment was over EUR 150 million (RON 727 million) or 30 percent compared to the previous year and over 50 percent higher than in 2014.

These investments in distribution networks brought significant increase in the operational efficiency as well as in quality of the distribution service. That led to a reduction of the average time of unplanned interruptions to consumers in 2016 compared to 2014, in all three distribution operators – from 10 percent at the distributor SDEE Muntenia Nord to 30 percent at SDEE Transilvania.

According to Catalin Stancu, Electrica’s general manager, this year’s plan is probably the most ambitious program in the energy sector. The goal is to increase the operational efficiency and the quality of services to that level that the average unplanned interruption time per user will get closer to the level of the Central European countries.

In parallel with these investments, Electrica will make important investments in the modernization of the IT infrastructure and information technology systems, at Group level.

Distribution companies within the Electrica Group cover over 40% of Romania’s territory, with an operating area of approximately 100,000 square kilometers. The three distribution companies within the Electrica Group have over 3.6 million consumers in 18 counties.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

ems ai transmission

Serbia’s TSO EMS plans to use AI in construction approvals

21 November 2024 - EMS has decided to automate its construction approval procedure by introducing state-of-the-art AI solutions

IPTO ENCS cybersecurity grid

Greece’s IPTO joins European Network for Cyber Security

21 November 2024 - The European Network for Cyber Security (ENCS) has announced that IPTO has officially joined the network as a full member

montenegro gvozd epcg nordex Ibrahim Özarslan

Montenegro’s power utility EPCG begins construction of Gvozd wind farm

21 November 2024 - Wind farm Gvozd will be the first large-scale power generation facility to be built by EPCG in more than 40 years

Bulgarian waterworks firm installs in pipe hydropower generator

Bulgarian waterworks firm installs in-pipe hydropower generator

21 November 2024 - A waterworks and sewerage firm in Bulgaria produces electricity using an in-pipe hydropower device in a supply line