News

Construction of Trans-Balkan Corridor’s section to start in 2018.

Construction of Trans-Balkan Corridor’s section to start in 2018.

Photo: WBIF

Published

December 26, 2017

Country

Comments

comments icon

0

Share

Published:

December 26, 2017

Country:

Comments:

comments icon

0

Share

Serbia has been given a grant of EUR 6.6 million by the German development bank KfW to build a section of the Trans-Balkan Electricity Corridor, Serbian Minister of Mining and Energy Aleksandar Antić said. The Minister said that the construction of the section of the power corridor between the towns of Kraljevo and Kragujevac would begin in 2018, adding that the plan is to complete construction in the year 2020.

“The securing of the funds needed to build this section means that the conditions have been met to start work on the section from the town of Obrenovac to Bajina bašta and on from that town to Plevlja in Montenegro and Višegrad in Bosnia-Herzegovina,” the Tanjug agency was told by Serbian Minister of Mining and Energy Aleksandar Antić at the opening of the section of the power corridor linking Pančevo with Romania.

That section from Pančevo in Serbia’s Vojvodina province to the Romanian town of Resita is 68 kilometers long and is managed by the public utility Elektromreža Srbije (EMS), Serbia’s transmission system operator (TSO), which invested EUR 27 million of its own funds in the section. The EMS contracted Serbian companies to build the section of the power corridor from the Pančevo 2 substation to the Romanian border.

Antić said the construction of all the sections of the power corridor through Serbia would cost some EUR 160 million.

Once completed, the electric power corridor will link Romania, Serbia, Bosnia and Herzegovina, and Montenegro with a 400 kV landline and will link those countries to Italy through an underwater power line. That 400 kV power line under the Adriatic Sea will be 455 kilometers long and will run from Lastva in Montenegro to Villanova in Italy.

The section whose opening the Minister attended is the first completed section of the Trans-Balkan Corridor.

Antić said the capital project would bring long-term benefits to Serbia, increasing its supply security, cutting down of power losses and helping develop the country’s energy system.

“This Pan-European electric power corridor will pass through Serbia bringing electricity from east to west. The investment will have a capital effect on our overall transmission and lower power losses of the grid which are the lowest in Europe,” the minister said. 

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

north macedonia kazanci memorandum gas power plant mickoski Cemil Kazancı

North Macedonia, Kazancı sign memorandum on gas power plants

23 July 2025 - The memorandum of understanding was signed by Prime Minister Hristijan Mickoski and Cemil Kazancı, President of the Board of Directors of Kazancı Holding

romania bess battery Nova Power & Gas gas power plant

Nova Power & Gas to install 200 MW BESS in Romania

23 July 2025 - Romanian company Nova Power & Gas is also beginning the construction of a 150 MW gas power plant in Florești, of 150 MW.

IRENA 91 percent new renewables units more cost effective than fossil fuel alternatives

IRENA: 91% of new renewables units are more cost-effective than fossil fuel alternatives

23 July 2025 - Renewables maintained their cost leadership in global power markets, the International Renewable Energy Agency said in an annual report

China based Astronergy solar cell factory western Turkey

China-based Astronergy to build solar cell factory in western Turkey

23 July 2025 - Astronergy allocated USD 700 million for its second solar module factory in Turkey. In the first phase, it would make wafers and cells.