Waste

City of Zagreb published tender for composting facility for biodegradable waste

City of Zagreb published tender for composting facility for biodegradable waste

Photo: Pixabay

Published

December 14, 2017

Country

Comments

comments icon

0

Share

Published:

December 14, 2017

Country:

Comments:

comments icon

0

Share

The City of Zagreb published a tender for exploration works and design of the composting facility for biodegradable waste on dumpsite “Obreščica”, needed for co-financing from EU funds.

The investment is worth HRK 4.5 million (EUR 600,000), and the submission deadline is January 9, 2018.

The Waste Management Plan of the Republic of Croatia for the period 2017-2022 foresees ‘Interventional Measures for Reduction of Municipal Waste Disposal in the City of Zagreb’, which includes, inter alia, the construction of facilities and/or procurement of equipment for the biological treatment of collected biowaste by 2020.

“The Plan states that for waste oils and waste sludge from wastewater treatment plants additional capacities should be provided through the development of biological waste treatment systems, such as composting and biogas facilities. Therefore, it is necessary to begin the construction of a composting facility for biodegradable waste on dumpsite “Obreščica” and the tender was published for research works and preparation of study and project documentation for the construction of a treatment facility for the biowaste on dumpsite Obreščica,” the City of Zagreb said in a tender documentation.

A total area of the Obreščica location is about 180 hectares, and about 5 hectares are planned for biowaste plants, which provides great flexibility in the selection of microlocation, especially considering a large number of privately-owned parcels.

The City of Zagreb has there sites with waste management license for composting and 47,000 tonnes of annual capacity.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Bankwatch Western Balkans abandon waste to energy incineration

Bankwatch: Western Balkans must abandon waste-to-energy incineration

22 April 2026 - Plans for waste incinerators and co-incineration in the Western Balkans pose high financial and health risks, CEE Bankwatch Network warns

international day of zero waste food waste

International Day of Zero Waste 2026: Everyone has a role to play in reducing food waste

26 March 2026 - This year’s International Day of Zero Waste, observed on March 30, focuses on ways to reduce food waste worldwide

bih sarajevo container textile wate serda green tex

Sarajevo installs digitalized containers for textile waste

13 February 2026 - Sarajevo, the capital of Bosnia and Herzegovina, has introduced ten special containers for the separation and recycling of textile waste

Montenegro landfill gas power plant entering electricity market

Montenegro’s landfill gas power plant entering electricity market

24 January 2026 - The first landfill gas power plant in the Western Balkans is in test operation, at the Možura landfill in Montenegro