News

First flue gas desulfurization control system to be installed in Ugljevik   

Flue gas, Yokogawa Wins Control System, Ugljevik

Photo: Pixabay

Published

December 1, 2017

Comments

comments icon

0

Share

Published:

December 1, 2017

Comments:

comments icon

0

Share

The Ugljevik power plant in Republika Srpska is going to have a CENTUM VP control system by Yokogawa Electric Corporation for a flue gas desulfurization system, the first of its type installed in the West Balkans. It will improve the environment and help meet environmental standards, required for joining the EU.

CENTUM VP integrated production control system for the monitoring and control of the flue gas desulfurization system will be delivered to Ugljevik by August 2018 by Yokogawa Electric Corporation, a Japanese electrical engineering and software company.

This system will start operating in October 2019, the company has announced in its press release. It is expected to help environment in the coal-fired Ugljevik’s vicinity to improve.

The 300 MW Ugljevik power plant supplies a quarter of the total electrical generation capacity of RS. It burns brown coal with high sulfur content so the emissions contain high levels of sulfur dioxide.

The upcoming project of delivery and installation of the control system CENTUM VP for a flue gas desulfurization system will be managed by the company’s subsidiary in Austria (Yokogawa GesmbH) and Belgrade-based Serbia office of Yokogawa Europe Branches B.V.

The order for CENTUM PV system for Ugljevik came from Mitsubishi Hitachi Power Systems, Ltd (MHPS), a member of the consortium. This was the first order from the Western Balkan although MHPS in the meantime signed also the agreement with the biggest Serbian power plant.

Mitsubishi Hitachi Power Systems, Ltd. (MHPS) will also install flue gas desulfurization (FGD) systems in the Nikola Tesla A coal-fired power plant (TENT A) in Serbia. The project worth EUR 167 million will help reduce sulfur dioxide (SO2) and particulates emissions, and enable Serbia to meet EU environmental standards.

This is the first time MHPS has received an order for FGD systems from Serbia.

The agreement on the construction of the desulfurization plant was signed between Serbian electric power company, Elektroprivreda Srbije (EPS), and MHPS this past  September in Belgrade.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

ems ai transmission

EMS plans to use AI in construction approvals

21 November 2024 - EMS has decided to automate its construction approval procedure by introducing state-of-the-art AI solutions

IPTO ENCS cybersecurity grid

Greece’s IPTO joins European Network for Cyber Security

21 November 2024 - The European Network for Cyber Security (ENCS) has announced that IPTO has officially joined the network as a full member

montenegro gvozd epcg nordex agreement

Montenegro’s power utility EPCG begins construction of Gvozd wind farm

21 November 2024 - Wind farm Gvozd will be the first large-scale power generation facility to be built by EPCG in more than 40 years

Bulgarian waterworks firm installs in pipe hydropower generator

Bulgarian waterworks firm installs in-pipe hydropower generator

21 November 2024 - A waterworks and sewerage firm in Bulgaria produces electricity using an in-pipe hydropower device in a supply line