Renewables

GE to supply 38 turbines for Serbia’s third largest wind farm

Photo: GE

Published

November 30, 2017

Country

Comments

0

Share

Published:

November 30, 2017

Country:

Comments:

0

Share

GE Renewable Energy will provide 38 turbines for the Serbia’s third largest wind farm Blacksmith “Kovačica”. A 15-year full-service agreement for 105 MW wind site is also part of the deal between GE Renewable Energy and Enlight Renewable Energy.

Enlight Renewable Energy will be an operator of the wind farm set to be built in the Vojvodina region North East of Serbia. The project is worth EUR 189 million, this company earlier said.

“GE Renewable Energy will provide 38 of its 2.75-120 wind turbine with 110m hub heights, a product ideally suited for the medium wind conditions of the Serbian great plains. Once fully commissioned in 2019, Blacksmith “Kovačica” will become Serbia’s third largest wind site,“ GE said in a statement.

Pete McCabe, President & CEO of GE’s Onshore Wind Business said that the Blacksmith “Kovačica” wind project represents one-fifth of the country’s wind capacity targets for 2020.

Gilad Yavetz, Enlight’s CEO said that this is a significant milestone for Enlight.

“This project will provide the entire power consumption for the equivalent of 65,000 households, in addition to creating jobs and boosting Serbia’s economic growth,” Yavetz said.

Wind turbines for the site will be produced in Europe in GE’s Salzbergen, Germany wind facility with blades manufactured by LM Wind Power in Spain and Poland.

GE Renewable Energy recently announced it would also provide turbines for Čibuk 1, Serbia’s future largest wind farm, which is also located in the North East of the country.

Together, Blacksmith “Kovačica” and Čibuk 1 will amount for 263 MW of clean wind energy added to the Serbian grid, a significant step towards the country’s goal to hit 500 MW of wind capacity by 2020.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

drina-hydropower-plants

Court annuls environmental permit for Drina hydropower project

02 May 2024 - The construction of large hydropower plants on the Drina is facing new delays, after a court ruling to scrap the environmental permit for HPP Foča

el-dorado-electricity-imports-north-macedonia-rke

North Macedonia: ‘Solar El Dorado’ cuts electricity imports to 2.75%

02 May 2024 - In 2023, North Macedonia's new solar capacity increased by as much as 251% compared to 2022

EU-completing-Green-Deal-Industrial-Plan-Net-Zero-Industry-Act

EU completing Green Deal Industrial Plan as Net Zero Industry Act awaits go-ahead

01 May 2024 - The European Union's Net Zero Industry Act is about to come into force, completing legislative work within the Green Deal Industrial Plan

Dubravka Dedovic Djedovic Handanovic reappointed Serbia minister of energy mining

Dubravka Đedović Handanović reappointed as Serbia’s minister of energy, mining

30 April 2024 - Minister of Energy and Mining Dubravka Đedović Handanović is keeping her seat in the new cabinet while Minister of Environmental Protection Irena Vujović is also becoming deputy prime minister