Renewables

Turkey leader in newly installed wind capacity in Southeast Europe

Photo: Pixabay

Published

July 31, 2017

Country

Comments

comments icon

0

Share

Published:

July 31, 2017

Country:

Comments:

comments icon

0

Share

Three countries in the Southeast Europe installed new wind capacity in the first half of 2017, with Turkey leading with 377.85 MW, according to data published by WindEurope.

In the first half of 2017, Croatia installed 20.7 MW and Greece 46 MW of wind capacity. Other countries in the Southeast Europe either did not install any new capacity in this period, or there were no relevant data.

In Europe, a total of 6.1 GW of extra wind energy capacity was installed in the first half of 2017. Of total capacity, 4.8 MW were new onshore capacity which was mainly concentrated in Germany (2.2 GW), UK (1.2 GW) and France (492 MW).

There were 18 offshore wind projects in four EU Member States (Germany, UK, Belgium and Finland), which saw a total of 1.3 GW installed, the WindEurope said.

Overall wind capacity in Turkey reached over 6 GW

The figures for Turkey has been confirmed by the Turkish Wind Energy Association (TUREB) which added that total wind capacity in Turkey reached 6,483 MW in the first half of 2017.

According to TUREB’s report, more than 75 percent of wind farms are located in the Aegean and Marmara regions of Turkey, and the wind energy capacity provides 7.5 million Turkish household with electricity.

TUREB said that 32 wind farms of 808 MW have been under construction in Turkey, Anadolu Agency Energy terminal reported.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Wind power investments Turkey surge major plants inaugurated in May

Wind power investments in Turkey surge as major plants inaugurated in May

03 June 2025 - Investments in wind power in Turkey are expected to surpass USD 1.5 billion this year, translating to 1.5 GW of new capacity

BESS factory of 1.5 GWh per year opening near Sofia in Bulgaria

BESS factory of 1.5 GWh per year opening near Sofia in Bulgaria

02 June 2025 - IPS, a Bulgarian manufacturer of battery energy storage systems, is about to launch operations at its new facility near Sofia

Western Balkans urged to step up just transition away from coal

Western Balkans urged to step up just transition measures

02 June 2025 - In its guidelines for the just transition, the Energy Community Secretariat said the Western Balkans lack policies and measures

Regional Power Sector Exchange Western Balkans disitribution system operator dso grids ohrid giz

Third Regional Power Sector Exchange in Ohrid: Power grids at core of energy transition

30 May 2025 - The third Regional Power Sector Exchange of the Western Balkans gathered over 80 energy professionals from the Western Balkans