Electricity

Chinese AVIC-ENG to build hydropower plant on Drina river

ERS

Photo: Buk Bijela

Published

June 21, 2017

Comments

comments icon

0

Share

Published:

June 21, 2017

Comments:

comments icon

0

Share

The Government of the Republic of Srpska (RS) has approved signing of the Memorandum of cooperation with China National Aero-Technology International Engineering Corporation (AVIC-ENG) on the construction of hydropower plant (HPP) Buk Bijela on the river Drina in Bosnia and Herzegovina.

The entity’s Minister of Industry, energy and mining Petar Đokić is authorized to sign the Memorandum of cooperation with the Chinese company by the RS government’s decision published on June 15.

The project worth BAM 382.4 million (EUR 195.1 million) on the Drina river in Bosnia and Herzegovina’s southeast is planned for installed capacity of 93.52 MW. The plant will be constructed in the upper course of the Drina river, about 11 kilometers upstream from the new bridge in Foča.

The Government of the Republic of Srpska signed last year an agreement with a consortium organized by state-owned utility Elektroprivreda Republike Srpske (ERS) and its subsidiary Hidroelektrane na Drini from Višegrad, for the construction and operation of HPP Buk Bijela.

The concession is for 50 years with a fee of 3.6% of income.

Expected annual production of the HPP is estimated at 332.3 GWh of electricity, with the flow capacity of 350 meters of cubic water per second.

The Buk Bijela HPP project has been causing concern over its impact on the river Tara, a tributary of Drina, which flows between Bosnia and Herzegovina and Montenegro. Environmental organizations fear that it will destroy the canyon of the Tara river, which is under protection of UNESCO.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

All set for construction of Široka draga wind park of 125.4 MW in BiH

All set for construction of Široka draga wind park of 125.4 MW in BiH

13 August 2024 - Local firm Imres Smart Greenergy signed the deal with the selected contractor on its Široka draga wind power project

montenegro lng terminal iap pipeline natural gas sahmanovic

IAP pipeline, LNG terminal are strategic projects for Montenegro – minister

12 August 2024 - The construction of an LNG terminal and the Ionian Adriatic Pipeline are strategic projects for the new Ministry of Mining, Oil and Gas

eps profit 2024 assembly report

Serbia’s EPS posts EUR 280.3 million profit for first half of 2024

12 August 2024 - Elektroprivreda Srbije has said that its net earnings were RSD 9.4 billion (EUR 80.3 million) higher than planned

Turkey promoting alternative Greece Cyprus power cable

Turkey promoting its alternative to Greece-Cyprus power cable

12 August 2024 - Last month Turkish warships chased away a vessel scanning the route for the Greece-Cyprus section of the Great Sea Interconnector