Electricity

GE Renewable Energy signs 10 year service agreement with Fina Enerji

Photo: Pixabay

Published

June 16, 2017

Country

Comments

comments icon

0

Share

Published:

June 16, 2017

Country:

Comments:

comments icon

0

Share

The GE Renewable Energy company and Turkish Fina Enerji signed a full service agreement covering 150 GE wind turbines in nine wind farms. This is the first agreement of its kind signed by Fina and covers a 10 year period with a two year trial period for GE’s Digital Wind Farm solutions powered by the Predix platform.

The Predix-powered Digital Wind Farm is aimed at boosting the operational efficiency of wind parks and improve their performance.

The new agreement, whose implementation starts in this quarter, replaces a previous services agreement and gives all operation and maintenance responsibilities to GE Renewable Energy.

GE Renewable Energy intends to use Digital Wind Farm hardware and software solutions which are designed for operational efficiency and performance enhancements.

GE Renewable Energy spokesman Sanjeev Addala said the goal is to bring data to customers and allow them to make informed management decisions while Fina spokesman Volkan Başkaya said the agreement makes GE a service provider and an operational partner with the incentive to make Fina projects a success.

GE’s Digital Wind Farm solutions include capabilities such as: Asset Performance Management, Operation Optimization and Business Optimization – including Cloud Connect, Wind Fleet Excellence, Enterprise e-SCADA, and Wind Power Forecasting, a GE statement said adding that with the application of full digital capabilities, GE Renewable Energy expects to develop smarter wind power forecasts to meet Turkish requirements.

GE Renewable Energy is a $10 billion start-up launched by the US conglomerate General Electric Co that brings products and services to the renewable energy industry. The start-up has installed more than 400 GW globally and is present in 55 countries employing more than 22,000 people.

Fina Enerji, a part of Turkey’s Fiba Group, selected GE turbines for several of its wind farms, including 50 MW plant near Istanbul and two with a combined capacity of 87.5 MW in the provinces of Izmir and Hatay.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

BiH town Gacko opposes 200 MW solar power project on agricultural land

BiH town Gacko opposes 200 MW solar power project on agricultural land

26 March 2026 - Local assembly in Gacko in Bosnia and Herzegovina withdrew support for a PV project on more than 200 hectares of agricultural land

Romania Hidroelectrica contractor Nehoiașu 2 hydropower

Romania’s Hidroelectrica to pick contractor for Nehoiașu 2 hydropower project

26 March 2026 - Hidroelectrica is selecting a company for the supply and installation of the equipment for the Nehoiașu 2 hydropower plant.

Nordex gets order for 70 MW wind power project Jasikovo in Serbia

Nordex gets order for 70 MW wind power project Jasikovo in Serbia

24 March 2026 - Nordex Group received an order for the supply and installation of eleven N175/6.X wind turbines for the Jasikovo wind farm in eastern Serbia

Serbian student team H-Bridges IEEE IFEC 2026 semifinals IEEE APEC conference

Serbian student team H-Bridges in IEEE IFEC 2026 semifinals at IEEE APEC conference

24 March 2026 - The H-Bridges student team from Serbia is in the semifinals of the International Future Energy Challenge (IFEC) competition in San Antonio, California, within the IEEE Applied Power Electronics Conference and Exposition.