Renewables

US interested in pumped storage hydropower projects in Romania, Bulgaria

US interested pumped storage hydropower projects Romania Bulgaria

Photo: Sebastian Burduja / Facebook

Published

April 30, 2025

Comments

comments icon

0

Share

Published:

April 30, 2025

Country:

,

Comments:

comments icon

0

Share

Minister of Energy of Romania Sebastian Burduja and Minister of Energy of Bulgaria Zhecho Stankov both met with United States Secretary of Energy Chris Wright and discussed bilateral cooperation in projects in their countries including for pumped storage hydropower plants and nuclear power plants. Burduja said studies would be conducted with American support for a string of pumped storage hydroelectric facilities throughout the Carpathians.

At the sidelines of the 2025 Three Seas Business Forum in Warsaw, Minister of Energy Sebastian Burduja held a meeting with US Secretary of Energy Chris Wright about ongoing strategic projects in which American companies are involved. He revealed that state-owned power utility Hidroelectrica has signed a memorandum with the National Renewable Energy Laboratory (NREL) of the United States on cooperation in pumped storage hydropower projects.

The initiative will put Romania “at the forefront of Europe” as it will store green energy throughout the Carpathian mountain range, according to Burduja. Prefeasibility and feasibility studies will be developed with American support, he added.

“In this era of energy transition, we need pragmatic and effective solutions that ensure secure, affordable, and clean energy – in that order of priorities. Romania and the United States share a vision for a common energy future, and our collaboration will significantly contribute to achieving this goal,” the minister stated.

Significant involvement of US companies in strategic energy projects in Romania

Burduja highlighted NuScale’s project for small modular reactors (SMRs) in Doicești and the contract signed with Fluor and Sargent and Lundy for units 3 and 4 at the Cernavodă nuclear power plant. Fluor is also participating in a project for a high-voltage direct current interconnector (HVDC), he pointed out.

The lack of interconnections is bolstering energy prices

The minister noted that American partners are involved in a project for mapping and utilizing geothermal sources for district heating in Bucharest, with support from the European Union’s Modernisation Fund. Namely, Electrocentrale Bucharest (ELCEN) has established cooperation with US-based Sage Geosystems.

Burduja recalled that US platform Transocean Barents is drilling for gas in the Neptun Deep project in the Black Sea.

The Romanian ministry said the two officials discussed the rise of energy prices, attributing it to the lack of interconnections and the challenge of closing coal-fired power plants without viable alternatives. They also touched upon the costs of carbon dioxide certificates and how they affect competitiveness, the announcement reads.

Stankov, Wright discuss possibility of building AI ‘gigafactories’

Bulgarian Minister of Energy Zhecho Stankov separately met with US Secretary of Energy Chris Wright. Bulgaria will be the first in Europe to deploy the American AP1000 technology, Stankov claimed.

The country is preparing to build two more units at the Kozloduy nuclear power plant, in a deal with Westinghouse Electric. State-owned Bulgarian Energy Holding is controlling the project.

The two officials discussed the possibility of building “artificial intelligence gigafactories” to complement the nuclear infrastructure and promote innovation and employment, the ministry said. In addition, Stankov and Wright spoke about projects for new pumped storage hydropower and the exploration of oil and natural gas in the Black Sea.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

montenegro zorana sekulic interview hydrogen program action plan ministry of energy

Sekulić: Montenegro is preparing for a hydrogen energy era

20 February 2026 - Zorana Sekulić, Director of the Directorate for Oil and Gas at the Ministry of Energy and Mining, is finishing doctoral studies in hydrogen

coal mining

Coal miners’ woes threaten electricity production across region

20 February 2026 - Miners at Romania’s coal complex CE Oltenia have staged protests, including hunger strikes, over plans to scrap meal vouchers and cut wages

montenegro electricity integration package eip market coupling energy community

Montenegro wraps up transposition of EU’s Electricity Integration Package

20 February 2026 - Montenegro has completed the transposition of the EU’s Electricity Integration Package, according to the Energy Community Secretariat

Albania KESH draft energy storage strategy with French help

Albania’s KESH to draft energy storage strategy with French help

20 February 2026 - Albanian state-owned KESH intends to draft an energy storage strategy with assistance from EDF and the French Development Agency (AFD)