23 February 2022 - The EU's carbon border tax or national CO2 pricing systems will affect both businesses and citizens in the region, businesspeople and experts warned at the conference Serbian Companies on the Changing Power Market.
09 February 2022 - Measures accompanying the CBAM must be directed to helping the Western Balkans adjust to the CO2 pricing system, experts say
05 January 2022 - State-owned energy utility EPBiH plans to install a photovoltaic plant of 56 MW at the site of an ash and slag dump at the Tuzla coal plant
28 December 2021 - A coal mill was damaged in the B2 unit of the Nikola Tesla B power plant (TENT B) while B1 is inactive since December 26 due to a fire
15 December 2021 - Prishtina was left without district heating as a coal plant broke down and Kosovo* is forced to import large quantities of electricity
15 December 2021 - State-owned utility EPS got some of the aging units functioning again after a breakdown, but the country is still relying on power imports
20 October 2021 - EPS will commission research for the purpose of installing a solar power plant at the location of the recently halted coal plant Kolubara B
15 October 2021 - Serbian state-owned power producer EPS aims to install 240 MW in solar power plants and 100 MW in wind farms by the end of the decade
23 September 2021 - E2S Power presented in its demonstration facility in Serbia’s capital Belgrade, the innovative thermal energy storage TWEST.
07 September 2021 - Almost 12,000 people died from 2018 to 2020 because of breaches of pollution ceilings in coal-fired thermal power plants in the Western Balkans.
01 September 2021 - Locals and environmentalists said the draft environmental study for Ugljevik 3 coal project is incomplete and that it doesn't reveal the real potential damage
20 August 2021 - Within its decarbonization process, KEK will develop infrastructure for the production of green energy, including a solar power plant of 100 MW
09 August 2021 - ProCredit Bank Kosovo has invited bids from interested companies to build and operate a 3 MW grid-connected solar photovoltaic power plant in the municipality of Lipjan.
02 August 2021 - The current version of the National Recovery and Resilience Plan may lead to a rapid coal exit in Bulgaria as the Maritsa East complex would be shut down
08 July 2021 - EPBiH picked five former open pit coal mines and ash and slag dumps for solar power projects. It intends to gradually close its thermal power plants.
06 July 2021 - Western Balkans need to set ambitious climate targets for the period through 2030 and reach carbon neutrality by mid-century, CAN Europe said