A tribunal operating under the World Bank has ruled in favor of ten companies that initiated arbitration with the argument that Romania violated the Energy Charter Treaty by lowering incentives for their solar power plants.

Romania was supposed to compensate investors when it altered its rules on incentives for renewable energy production, according to an arbitration panel at the International Centre for Settlement of Investment Disputes – ICSID. Ten companies from Austria, the Netherlands, Germany and Cyprus launched a case in 2018 under the Energy Charter Treaty (ECT) and the ICSID Convention.

They built five solar power plants. The investors, led by LSG Group from Austria, argued that they were encouraged to invest in the country but that changes in 2013, 2014, 2017 and 2018 caused them losses in relation to their business plans.

The decision is not yet final, but the two sides were asked to negotiate on rightful compensation. ICSID was founded in 1996. It operates under the World Bank.

Changes in regulations were too drastic

Romania claimed it did not commit to never changing the legislation and said it was necessary to reduce overcompensation and limit the increase in electricity prices for consumers. The tribunal pointed out, citing the Energy Charter Treaty, that the changes were too drastic.

The Ministry of Energy said it doesn’t expect new lawsuits in relation to the ruling.

Romania introduced a green certificate scheme in 2008 for electricity from renewable sources. Investors were entitled to six green certificates per megawatt-hour that suppliers were obligated to buy, so producers would receive an extra EUR 162 per MWh to EUR 330 per MWh by trading within the mechanism.

Electricity costs were threatening to sink Romanian industry

In 2013, the government cut the number of green certificates to four per megawatt-hour and delayed the payment for the rest to between 2025 and 2030. Romania altered the rules with the argument that the price of solar power equipment dropped sharply and that the industry was suffering under the high cost of the green certificates.

Of note, French President Emmanuel Macron said last week that his country would withdraw from the Energy Charter Treaty. Spain, the Netherlands and Poland earlier made similar decisions. Investors have been launching cases against host countries as their governments canceled energy projects and introduced stricter environmental rules to comply with the Paris Agreement on climate change.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

serbia world bank loan gas pipelines energy efficiency subsidies dubravka djedovic gil pontara

Serbia negotiating loan to finance gas pipelines, energy efficiency

27 March 2026 - The Government of Serbia is discussing a new program to finance the construction of gas pipelines and subsidize energy efficiency measures

Andritz ten turbines modernization hydropower cascade Vlasina in Serbia

Andritz to supply ten turbines for modernization of hydropower cascade in Serbia

27 March 2026 - Serbian contractor Energotehnika Južna Bačka selected Andritz to supply ten new turbines for the modernization of EPS's Vlasina hydropower cascade

Eurowind Energy to inaugurate Pecineaga wind park next month

Eurowind Energy to inaugurate Pecineaga wind park next month

27 March 2026 - Final testing is underway at the 48 MW wind power plant in Pecineaga in southeastern Romania, and the inauguration is in a month

BiH town Gacko opposes 200 MW solar power project on agricultural land

BiH town Gacko opposes 200 MW solar power project on agricultural land

26 March 2026 - Local assembly in Gacko in Bosnia and Herzegovina withdrew support for a PV project on more than 200 hectares of agricultural land