News

Green power giant EDP increases subsidiary capital

Published

April 1, 2016

Comments

comments icon

0

Share

Published:

April 1, 2016

Comments:

comments icon

0

Share

Spain-based EDP Renováveis SA strengthened the share capital in its Romanian subsidiary by EUR 30 million, according to data published in the Official Gazette. Romania Journal reported the company majority-owned by EDP – Energias de Portugal SA doesn’t plan wind power expansion, rather that it aims to boost existing projects, according to Laura Lazar, who heads asset management.

The portfolio of EDP Renováveis Romania consists of 471 MW in wind turbines in Constanţa, Tulcea, Vaslui and Ialomiţa and 50 MW in photovoltaics in Dolj, Gorj and Mehedinţi. The second-largest wind farm in the country is in Făcăeni in Ialomiţa, controlled by EDP’s Ialomiţa Power Srl. The Portuguese investor conducted a capital increase of EUR 52 million in September.

Last year power production in Romania grew 7.8% to 69.37 TWh, according to data from the National Institute of Statistics. Thermal power stations generated 1.65 TWh, a 6.2% increase on the year, hydropower output fell 12.2% to 16.69 TWh, and nuclear units produced 11.64 TWh or 0.3% less than in 2014. Wind turbines contributed 7.05 TWh, advancing 2.32 TWh, while photovoltaic facilities generated 1.99 TWh or 692 GWh more than in the previous year, the report said.

Installed green power capacity reached 5.15 MW at the end of January, according to transmission operator Transelectrica SA’s data. Wind farms accounted for 3,13 MW, photovoltaic panels contributed with 1,34 MW, small hydro projects had 585 MW and biomass participated with 103 MW.

Related Articles

Montenegro NECP public consultation sole coal plant shutdown 2041

Montenegro publishes NECP for public consultation – sole coal plant planned for shutdown in 2041

30 June 2025 - The retirement of the Pljevlja coal plant is planned for 2041, but it depends on a just transition and supply security, the draft NECP reads

hydrogen natural gas pipeline

Serbia plans hydrogen transport through gas pipelines

30 June 2025 - Gas transmission system operator Transportgas has invited bids for producing a study on hydrogen transport through the gas network

LONGi ignites Romania energy transition 54 1 MW BC

LONGi ignites Romania’s energy transition with 54.1 MW BC technology triumph

30 June 2025 - A PV plant in Romania's northwest is on schedule for a grid connection in the fourth quarter. It features LONGi Solar's BC modules.

Delyan Iliev, Managing Director of REIB

Energy storage in focus: How custom insurance solutions are fueling Southeast Europe’s green transition

27 June 2025 - Delyan Iliev, Managing Director of Renewable Energy Insurance Broker (REIB), talks about the critical role of custom-made insurance solutions in the success of BESS projects.