Renewables

EPS invites expressions of interest for construction of 66 MW Kostolac wind farm

Kostolac

Photo: Pixabay

Published

September 2, 2019

Country

Comments

comments icon

0

Share

Published:

September 2, 2019

Country:

Comments:

comments icon

0

Share

State power utility Elektroprivreda Srbije (EPS) has issued an invitation for expressions of interest in international public bidding (with pre-qualification) for the Procurement of Goods, Works and Associated Services for the Renewable Energy Project Kostolac – Wind Park, Serbia, which will be EPS first wind farm.

The project includes the construction of a 66 MW wind farm in Kostolac, 90 km east of Belgrade on the Danube River, the invitation reads.

The application deadline is October 1, while tendering for the project is expected to take place in Q4/2019, EPS said in the invitation published in local newspapers.

A building permit has already been obtained for most of the project

The investment will be financed from a KWf loan. EPS and KfW signed a loan agreement worth EUR 80 million in November 2017.

According to the invitation, project development is already under way (the Environmental Impact Assessment (EIA) Study has been completed, along with the Feasibility Study with the Preliminary Design and Building Permit Design for the Kostolac Wind Farm, and the Conceptual Solution for internal roads), and a building permit has already been obtained for most of the project.

In January 2019, EPS obtained an energy permit for the construction of the wind farm.

The project is divided into two tenders. Tender 1: Wind turbines, foundations, electrical works including 20 wind turbines with a maximum wind turbine rotor height (hub height) of 117 m; and Tender 2: Civil engineering works including internal roads and connections to access roads.

The objective of the project is to increase and diversify energy resources and contribute to the generation of electricity in Serbia without the emission of harmful gases, and hence without adverse environmental impacts. The project will also contribute to sustainable economic development, social development, and environmental and climate protection, according to the invitation.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

serbia solar wind 2025 projections

Serbia to add 138 MW in solar, wind in 2025

21 February 2025 - The estimated capacity of prosumers is 123.6 MW, out of which 43 MW would be new photovoltaics, according to the energy balance

Energy industry confidence in net-zero goals sinks EIC report

Energy industry confidence in net zero goals sinks – report

21 February 2025 - Energy industry confidence in reaching net zero targets is fading, according to Net Zero Jeopardy Report II by the Energy Industries Council

EU renewables role Vision for Agriculture and Food

EU acknowledges renewables role in Vision for Agriculture and Food

21 February 2025 - Green energy and energy communities are beneficial for farmers, the European Commission said in its Vision for Agriculture and Food

Kosovo four applications wind power auction

Kosovo* receives four applications for wind power auction

21 February 2025 - German, Kosovar, French and Turkish companies submitted documentation to qualify for the first wind power auction in Kosovo*