Renewables

Danish Eurowind Energy developing 70 MW agrivoltaic project in Romania

agrivoltaic-projectsheep-sun-solar

Photo: Derks24 from Pixabay

Published

June 13, 2023

Country

Comments

comments icon

0

Share

Published:

June 13, 2023

Country:

Comments:

comments icon

0

Share

Danish renewable energy company Eurowind Energy is developing an agrivoltaic project in Romania, a 70 MW photovoltaic park that will combine solar energy with agriculture.

The construction of the EUR 50 million agrivoltaic park, located near Teiuş in the Romanian county of Alba, is slated to begin in October this year, according to reports. It is expected to be completed in 2024.

The solar park will generate enough electricity to supply 30,000 homes

The solar park will span 80 hectares, with 119,184 modules, while its projected annual electricity output is about 102 GWh, enough to supply some 30,000 households.

130 farmers will be able to use the land for their animals to graze

At the same time, 130 farmers will be able to use the 80-hectare land for their animals to graze, according to media reports, which citied a press release from Eurowind Energy.

Agrisolar is slowly making its way into Southeastern Europe

The combination of agriculture and solar power is slowly making its way into Southeastern Europe, with a growing number of investors embracing agrivoltaics, also known as agrisolar.

Recently, works were launched on Croatia’s first agrisolar power plant, in a project that will involve sheep farming. Earlier this year, Hungary-based BSD Invest Europe said it was planning to install a solar park with on the Serbian-Montenegrin border, which would simultaneously be used for sheep farming and growing berries.

The Teiuş solar park is the fourth renewable energy project developed by Eurowind Energy in Romania. The company has 12 operational energy parks across Europe with a combined capacity of 100 MW, according to the reports.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

krsko 2 spatial plan

Slovenia launches public consultation on spatial plan for second unit at Krško nuclear plant

01 July 2025 - The Ministry of Natural Resources and Spatial Planning has published an initiative to prepare a spatial plan for the second unit of nuclear power plant Krško.

Turkey first hydropower reservoir YEKA floating solar power auction

Turkey selects first hydropower reservoir for YEKA floating solar power auction

01 July 2025 - The reservoir of the Demirköprü hydropower plant is the first proposed area for Turkey's planned floating solar power auction

Hungary MAVIR 60 MWh battery energy storage system

Hungary’s MAVIR commissions 60 MWh battery energy storage system

01 July 2025 - MAVIR, the Hungarian TSO, put into operation a battery energy storage system (BESS) of 20 MW in capability and a three-hour cycle.

Montenegro NECP public consultation sole coal plant shutdown 2041

Montenegro publishes NECP for public consultation – sole coal plant planned for shutdown in 2041

30 June 2025 - The retirement of the Pljevlja coal plant is planned for 2041, but it depends on a just transition and supply security, the draft NECP reads