Renewables

Bulgarian city seeks to set up country’s first energy community

gabrovo-bulgaria-first-energy-community

Gabrovo (photo: beni_04 from Pixabay)

Published

November 20, 2023

Country

Comments

comments icon

0

Share

Published:

November 20, 2023

Country:

Comments:

comments icon

0

Share

The Bulgarian Municipality of Gabrovo has issued a public call for joining the country’s first energy community, which would build a solar power plant on the site of a regional landfill for non-hazardous waste. Setting up energy communities in Bulgaria was made possible by recent legislative changes, but the bills are facing opposition from President Rumen Radev.

Bulgaria’s first energy community is expected to develop its renewable energy plant in an investment valued at BGN 180,000 (EUR 92,000). Eligible to take part in the project are individuals, local bodies including municipalities, non-governmental organizations, and small and medium-sized businesses.

The Gabrovo energy community will include both citizens and legal entities

The financial participation of an individual or legal entity can be no less than BGN 500 (EUR 255) and no more than BGN 5,000 (EUR 2,550), according to a statement from the municipality. The call is open until January 31 or until the necessary funds are raised.

According to the statement, an energy community is a group of legal entities and individuals who together produce energy from renewable sources.

The application process has two stages, the first being open only to participants registered on the territory of the municipality of Gabrovo, and the second to participants from other regions of Bulgaria. The city is located in the country’s central part, near Veliko Tarnovo.

Laws regulating energy communities may be overturned

The project comes less than two months after the adoption of changes to Bulgaria’s Law on Energy that introduced energy communities. Bulgaria’s Energy from Renewable Sources Act, which was also amended recently, regulates the establishment and operation of citizen energy communities.

President Radev seeks to overturn the laws so as to protect agricultural land and consumers

The Bulgarian parliament passed the two bills in a bid to avoid losing access to funds from the European Union’s Recovery and Resilience Facility. However, due to controversies over a number of provisions, President Rumen Radev is trying to overturn them both.

Radev has referred the renewables law to the Constitutional Court of Bulgaria to prevent the use of agricultural land for electricity production, and has refused to sign the changes to the energy law over the lack of a mechanism to protect consumers.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

serbia hemofarm rooftop solar plant vrsac

Hemofarm commissions one of largest rooftop solar plants in Serbia

27 February 2026 - The largest rooftop solar plant in Serbia is on the buildings of polymer products maker Peštan

greenvolt wind farm loans

Portugal-based Greenvolt secures financing for two wind projects in Romania

27 February 2026 - Greenvolt has secured over EUR 400 million for its 253.1 MW Ialomiţa Nord wind farm project and another 49.8 MW in Călărași county

Green hydrogen or lost leadership, Thomas Hillig, EUSEW digital ambassador

Green hydrogen or lost leadership? Europe must act before China wins

27 February 2026 - Europe’s green hydrogen ambitions face weak demand and high costs. To compete with China, the EU must shape market design and build industry now.

Electrica install 500 MW solar park Liberty Galați steel plant in Romania

Electrica to install giant solar park with storage at Liberty Galați steel plant in Romania

26 February 2026 - Electrica agreed with inactive steel plant Liberty Galați to jointly develop solar power and energy storage capacities of up to 500 MW