Renewables

Biogas CHP plant in Botoš could be 1st facility in Serbia to harness waste heat

Biogas CHP plant in Botoš could be 1st facility in Serbia to harness waste heat

Slika: bioelektra.rs

Published

April 23, 2018

Country

Comments

0

Share

Published:

April 23, 2018

Country:

Comments:

0

Share

A biogas combined heat and power plant (CHP) in the Vojvodina village of Botoš could be the first facility in Serbia to start using waste heat, to provide heating to local public and other facilities, according to reports.

The facility could take this step with the support of the Serbian Ministry of Environmental Protection, the German federal state of Baden-Württemberg, and the Development of a Sustainable Bioenergy Market in Serbia project, implemented by the German Society for International Cooperation (GIZ), according to the City of Zrenjanin’s website.

The 600-kW CHP plant, using agricultural biomass as fuel, is operated by Botoš-based Bioelektra, which unveiled the facility under an EUR 2.5 million investment in 2016, backed by the Dutch government with an EUR 688,000 equipment donation and the Serbian Ministry of Mining and Energy with an EUR 275,000 subsidy.

Bioelektra’s owner Branislav Pomoriški said that GIZ is making utmost efforts to help introduce district heating in Botoš, a village of some 2,000 residents.

“The idea is very realistic, and we can expect Botoš to become the first village in Serbia to have district heating in the near future,” added Pomoriški during a visit of Andre Baumann, state secretary in Baden-Württemberg’s Ministry of the Environment, Climate Protection, and the Energy Sector.

Facility’s capacity planned to be tripled

For Zrenjanin Mayor Čedomir Janjić, this is a great idea, one that would both cut costs and save heat energy. “We are making additional efforts to find partners and finance the construction of a heat pipeline to run to the center of the village, where public institutions are, and of course to ensure the entire project is cost-effective for end-users,” he said.

The facility is planned to boost its installed capacity to 1.8 MW and produce 15 million kWh of electricity annually, up from 5 million kWh currently.

Apart from public facilities spanning some 5,000 square meters, the project could also provide heating using hot water to residential facilities with a floor area of 3,000 square meters.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

coal-power-generation-eu

Fossil fuels returned as top energy source in EU power generation in 2021

01 July 2022 - Among renewable sources, the biggest increase in 2021 was seen in electricity produced from solar energy, 13%,

Voltalia breaks ground Albania biggest solar park Western Balkans Karavasta

Voltalia breaks ground in Albania for biggest solar park in Western Balkans

01 July 2022 - The site for the Karavasta solar park spans 196 hectares in Fier county in Albania's west. The planned capacity is 140 MW.

net-loss-eps-q1

Serbia’s power utility EPS posts Q1 net loss of EUR 254 million

30 June 2022 - The state-owned power utility is blaming the poor result on a drop in output, electricity imports, and capped prices for end-consumers

EU agrees fossil fuel car ban as climate package talks are starting

EU agrees fossil fuel car ban as climate package talks are starting

29 June 2022 - The Council of the EU and European Parliament are set for talks on the Fit-for-55 package. Both agree new combustion engines should be banned by 2035.