News

Prime minister’s son applies for hydro plant construction

Published

May 20, 2015

Comments

comments icon

0

Share

Published:

May 20, 2015

Comments:

comments icon

0

Share

Blažo Đukanović submitted an application to the Ministry of Sustainable Development, in the name of his company BB Hidro, to build a mini hydropower plant on the Raštak river in Kolašin area in northern Montenegro, Vijesti newspaper from Podgorica reported.

The document, signed by Slaven Burzanović, authorized representative, was submitted on May 15, the report said. Blažo’s father is Milo Đukanović, the country’s prime minister.

The company asks the ministry for urbanistic-technical conditions as the first paper in the procedure to get a building permit for the facility on the locality of Raštak/Mioska in Kolašin municipality. BB Hidro, with Blažo Đukanović as executive director, is registered for power generation. Blažo Đukanović founded an electric installations enterprise in the summer of 2011 with Ivan Burzanović, the report said. Vijesti published a list of people, allegedly close to Đukanović family, who have entered the business in the last two years.

Related Articles

bih republic of srpska hydropower plants bistrica tunnels petar djokic

Three hydropower plants on Bistrica river to be finished by end-2026

18 April 2025 - Chinese company AVIC is in charge of building the three hydropower plants on the Bistrica, with a total capacity of 39 MW

albania france kesh afd drin hydropower energy storage

Albania’s KESH, France’s AFD sign MoU on hydropower management, energy storage 

18 April 2025 - KESH and Agence Française de Développement have signed an MoU on the Drin cascade management and advanced energy storage planning

bih sarajevo Register of Air Emissions and the Information System of Air Pollutants home fireplaces

Sarajevo rolls out fully digital system to track air-polluting emissions

18 April 2025 - The capital of Bosnia and Herzegovina has developed a register of air-polluting emissions and an information system to track pollutants.

bih federation ephzhb court poklecani urban permit arhaus

Supreme Court of Federation of BiH annulls urban permit for Poklečani wind farm

17 April 2025 - The project is being developed by Elektroprivreda HZHB, one of the three state-owned power utilities in Bosnia and Herzegovina