Renewables

One megawatt per day: North Macedonia enjoys strong renewable energy growth

Marko Bislimoski, President of the Energy, Water Services, and Municipal Waste Management Services Regulatory Commission of the Republic of North Macedonia

Photo: Balkan Green Energy News

Published

November 10, 2025

Comments

comments icon

0

Share

Published:

November 10, 2025

Comments:

comments icon

0

Share

Over the past four years, North Macedonia has achieved strong growth in renewable energy sources. A total of 1,200 MW of capacity has been connected to the grid, marking a new phase of the country’s energy transition, according to Marko Bislimoski, President of the Energy, Water Services, and Municipal Waste Management Services Regulatory Commission of the Republic of North Macedonia (ERC or RKE).

According to ERC data, almost 1 MW of renewable capacity has been added to the grid every day over the past four years.

Between 2022 and October 2025, North Macedonia built 1,200 MW of renewable power generation capacity, Bislimoski said at the Regional Conference on Green Transformation of the Western Balkans, held in Tirana, Albania.

“Electricity generation from solar power has become a reality – the El Dorado of photovoltaic plants has heralded the country’s energy transition, initiating a transformation of the power sector. The figures are encouraging, but the period ahead will be full of challenges, among which is balancing the system, when it comes to renewable electricity generation,” Bislimoski said.

Solar power capacity has overtaken hydropower

At the recently held 14th International Forum on Energy for Sustainable Development (IFESD-14), Sanja Božinovska, Minister of Energy, Mining and Mineral Resources, said that renewable energy sources account for more than half of North Macedonia’s total installed electricity generation capacity – 56% as of 2024.

Solar power plants account for 28%, while large hydropower plants have a 24% share.

“For the first time in our history, solar has overtaken hydro – a symbolic and practical milestone in our path toward decarbonization,” Božinovska stated.

Need for investments in baseload generation

Bislimoski emphasized that in the current phase of the energy transition, it is necessary to encourage investments in energy facilities that produce baseload energy.

The use of battery storage has its role, but it is essential to implement projects that will replace coal-fired power generation with gas or biomass, he added

The digitalization of administrative procedures for obtaining the necessary permits and documentation was highlighted as a key prerequisite for increasing the number of green investments, according to the panel How to Create Zones for Faster Implementation of Green Projects.

Speakers, including energy experts, economists, and representatives of national and local authorities, agreed that the energy transition will only be successful if households also feel its benefits, not just industry. Policies and reforms aimed at building a smart and green energy future must be a priority for regional governments to facilitate integration into the European energy market.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Most read articles on Balkan Green Energy News in 2025

Most read articles on Balkan Green Energy News in 2025

02 January 2026 - Battery storage and digitalization stepped into the spotlight in 2025, according to the readers of Balkan Green Energy News, which marked its tenth anniversary with the best results so far

serbia eps solar 1 gw Dubravka djedovic handanovic dusan zivkovic

Đedović Handanović: Construction of 1 GW solar project to start in 2026

31 December 2025 - The shareholders' assembly of of Elektroprivreda Srbije adopted the Three-Year Business Plan for the period 2026-2028

China commissions world largest open sea PV plant

China completes grid connection of world’s largest open sea PV plant

31 December 2025 - CHN Energy fully connected to the mainland grid a 1 GW solar power system that it built on the open sea off the coast of Shandong in China

Electrica call contractors for large PV parks in Romania

Electrica issues call for contractors for large PV parks in Romania

31 December 2025 - Electrica, in which the Romanian Government holds almost 50%, is again seeking contractors for its solar projects Satu Mare 3 and Bihor 1