Renewables

Wind energy segment stalls in Greece with just 125 MW in annual gains

Wind energy stalls in Greece with just 125 MW in annual gains

Photo: HWEA

Published

January 27, 2025

Country

Comments

comments icon

0

Share

Published:

January 27, 2025

Country:

Comments:

comments icon

0

Share

Wind energy had a slow year in Greece, adding just 125 MW of new capacity in 2024.

According to the Hellenic Wind Energy Association (HWEA or ELETAEN), after expanding by 230 MW in 2022, the sector added 543 MW in 2023 and then stalled in 2024, with only 125 MW.

Specifically, 39 new wind turbines were installed, representing investments of EUR 150 million. The total installed wind capacity in the country reached 5.36 GW by the end of last year.

2025 to bring increased installation

Despite the slowdown, HWEA estimates that in 2025 volumes would pick up as a result of projects maturing and entering the construction phase. The association also notes that regulatory hurdles by local bodies continue to plague the sector and delay investments.

Over 1.1 GW of new wind farms are currently under construction or contracted. Most of them are expected to connect to the grid within the next 18 months. Another 300 MW has been selected through auctions or letters of guarantee were submitted. As a result, total capacity is expected to reach 6.5 GW in the next two years.

Wind farms are spread unevenly across the country. Central Greece accounts for 44%, with 2.35 GW. Peloponnese follows with 12% or 667 MW while Eastern Macedonia and Thrace is third with 10% or 535 MW.

Terna Energy remains biggest player in the market

Terna Energy, recently acquired by Masdar, is the number one player in the sector, with a 19.3% share (1.03 GW). MORE, Motor Oil’s subsidiary, follows with 14.3% (766 MW). Iberdrola Rokas has a 7.6% share (409 MW), compared to 6.8% (368 MW) for Principia (formerly Enel) and PPC Renewables with 5.2% (276 MW).

When it comes to turbine suppliers, Vestas has provided machines for 44.7% of combined capacity. Next are Enercon (25.8%), Siemens Gamesa (16.8%), Nordex (7.3%) and GE Renewable Energy (3.8%).

Last but not least, wind energy had its highest hourly share on Monday, April 8, at 3:00-4:00 am, covering 90.3% of the country’s power production. Wind stood at over 30% for 2,575 hours last year.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

world ember bess solar energy storage cost capex lcos

Solar power has become dispatchable anytime at low cost

15 December 2025 - Ember’s assessment of energy storage costs is based on recent auctions in Italy, Saudi Arabia and India and on expert interviews

Applications open for the EUSEW 2026 Awards

Applications open for EUSEW2026 Awards

15 December 2025 - Applications are open for the EUSEW2026 Awards, which recognise projects, initiatives and leaders at the forefront of the EU's energy transition

corbii mari nofar solar romania

Nofar Energy launches work on Romania’s largest solar park

13 December 2025 - Israel's Nofar Energy has begun construction of the 282 MW Corbii Mari solar park in Romania, with plans to connect it to the grid in 2026

Turkey awards 1 15 GW wind power auctions all at EUR 35 per MWh

Turkey awards 1.15 GW in wind power auctions – all at just EUR 35 per MWh

12 December 2025 - The six winners from the latest round of wind power auctions under the YEKA mechanism in Turkey have EUR 35 per MWh guaranteed