Electricity

Kosovo* power utility KEK replaces acting CEO

Kosovo power utility KEK replaces acting CEO

Photo: KEK

Published

February 27, 2024

Country

Comments

0

Share

Published:

February 27, 2024

Country:

Comments:

0

Share

The Board of Directors of Kosovo Energy Corp. (KEK) appointed Bekir Gërguri as acting chief executive officer and Ramadan Budakova as his deputy, also in an acting capacity.

The change in leadership in Prishtina-based KEK has prompted controversy. Bekir Gërguri has been named acting CEO instead of Përparim Kabashi, who has returned to his previous position as secretary. Ramadan Budakova became acting deputy CEO of the government-controlled electricity producer.

The company runs the only two coal-fired power plants in Kosovo*, which account for more than 90% of domestic output. But KEK also has a major renewables project underway, backed by funding from the European Union.

Connections between the newly appointed CEO and Kosovo’s ruling party Lëvizja Vetëvendosje (LVV) surfaced immediately after the announcement. Gërguri’s previous affiliation with it, including his candidacy for the Municipal Assembly of Fushë Kosova (called Kosovo Polje in Serbian), has raised questions about potential political influence.

KEK generated 5.53 TWh of electricity last year

Additionally, there are concerns about reports that Budakova was accused of planting wheat over a decade ago on KEK land near coal mines without authorization, resulting in his demotion.

There were issues with earlier leadership as well. Police arrested former CEO Nagip Krasniqi last year over alleged tender manipulation. He was released from detention last September, but the legal proceedings against him are ongoing.

As Kosovo’s primary energy provider, KEK plays a vital role in the country’s infrastructure and economy. It remains to be seen how the new management will navigate the challenges ahead and address concerns about transparency, accountability, and political influence.

KEK generated 5.53 TWh of electricity last year. The Kosovo A thermal power plant contributed 2.29 TWh, while Kosovo B accounted for the remainder.

Separately, through the cogeneration project with Prishtina’s Termokos, over 327 GWh of thermal energy was generated for heating purposes. This significant output has been achieved through the combustion of coal, with a total of 6.92 million tons extracted during the year 2023.

* This designation is without prejudice to positions on status and is in line with UNSCR 1244/99 and the ICJ Opinion on the Kosovo declaration of independence.
Tags: ,
Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Japan Bistrica pumped storage hydropower project JICA Serbia

Japan approves participation in Bistrica pumped storage hydropower project in Serbia

08 May 2024 - Japan has formalized the participation of state agency JICA in the Bistrica pumped storage hydropower project in Serbia

shell energy europe cropex guarantees of origin

Shell Energy Europe to participate in guarantees of origin auctions in Croatia

08 May 2024 - Shell Energy Europe Limited and 3Degrees Group Inc. have registered for participation in auctions for guarantees of origin at CROPEX

Renewables record 30 global electricity 2023 growth solar wind Ember

Solar, wind push renewables to record 30% global electricity share

08 May 2024 - Renewables generated a record 30% of global electricity in 2023, driven by growth in solar and wind, Ember said in an annual report

AAE gamit slovenia Energie AG wind solar

Energie AG acquires stake in Slovenian wind, solar developer

08 May 2024 - Energie AG aims to develop wind farms and photovoltaic parks in Slovenia with a total capacity of more than 180 MW