Electricity

Kosovo* power utility KEK replaces acting CEO

Kosovo power utility KEK replaces acting CEO

Photo: KEK

Published

February 27, 2024

Country

Comments

comments icon

0

Share

Published:

February 27, 2024

Country:

Comments:

comments icon

0

Share

The Board of Directors of Kosovo Energy Corp. (KEK) appointed Bekir Gërguri as acting chief executive officer and Ramadan Budakova as his deputy, also in an acting capacity.

The change in leadership in Prishtina-based KEK has prompted controversy. Bekir Gërguri has been named acting CEO instead of Përparim Kabashi, who has returned to his previous position as secretary. Ramadan Budakova became acting deputy CEO of the government-controlled electricity producer.

The company runs the only two coal-fired power plants in Kosovo*, which account for more than 90% of domestic output. But KEK also has a major renewables project underway, backed by funding from the European Union.

Connections between the newly appointed CEO and Kosovo’s ruling party Lëvizja Vetëvendosje (LVV) surfaced immediately after the announcement. Gërguri’s previous affiliation with it, including his candidacy for the Municipal Assembly of Fushë Kosova (called Kosovo Polje in Serbian), has raised questions about potential political influence.

KEK generated 5.53 TWh of electricity last year

Additionally, there are concerns about reports that Budakova was accused of planting wheat over a decade ago on KEK land near coal mines without authorization, resulting in his demotion.

There were issues with earlier leadership as well. Police arrested former CEO Nagip Krasniqi last year over alleged tender manipulation. He was released from detention last September, but the legal proceedings against him are ongoing.

As Kosovo’s primary energy provider, KEK plays a vital role in the country’s infrastructure and economy. It remains to be seen how the new management will navigate the challenges ahead and address concerns about transparency, accountability, and political influence.

KEK generated 5.53 TWh of electricity last year. The Kosovo A thermal power plant contributed 2.29 TWh, while Kosovo B accounted for the remainder.

Separately, through the cogeneration project with Prishtina’s Termokos, over 327 GWh of thermal energy was generated for heating purposes. This significant output has been achieved through the combustion of coal, with a total of 6.92 million tons extracted during the year 2023.

* This designation is without prejudice to positions on status and is in line with UNSCR 1244/99 and the ICJ Opinion on the Kosovo declaration of independence.
Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

bulgaria electricity prices subsidies energy crisis iran traycho traykov

Bulgaria plans scheme to subsidize electricity prices for businesses

01 April 2026 - On Bulgaria's power exchange, IBEX, the day-ahead price for April 2 reached EUR 136.6 per MWh, compared to EUR 67.5 per MWh on February 27

Siemens Energy to replace transformers at Romania's largest hydropower plant Iron Gate 1

Siemens Energy to replace transformers at Romania’s largest hydropower plant

01 April 2026 - Hidroelectrica picked Siemens Energy to supply seven transformers within the modernization of the Iron Gate 1 hydropower plant on the Danube

How to choose a BESS integrator for utility-scale solar projects

31 March 2026 - Solar developers need to consider four main factors when selecting the integrator for a battery energy storage system (BESS)

NGEN Group Austria Europe largest energy storage

NGEN Group breaks ground in Austria for one of Europe’s largest energy storage facilities

31 March 2026 - NGEN Austria has launched works on a two-hour BESS of 85 MW in Wagenham, set to become the biggest in the country and one of the biggest in Europe