Renewables

EU starts European Hydrogen Bank pilot auction

EU-starts-European-Hydrogen-Bank-pilot-auction

Photo: iStock

Published

November 24, 2023

Country

Comments

comments icon

0

Share

Published:

November 24, 2023

Country:

Comments:

comments icon

0

Share

The European Commission issued a public call for the European Hydrogen Bank pilot auction with an initial budget of EUR 800 million. Renewable hydrogen producers will be able to bid for a fixed premium of up to EUR 4.5 per kilogram for a maximum of 10 years to support their projects.

Just over a year after European Commission President Ursula von der Leyen unveiled a plan for a support mechanism, the countdown has started for the European Hydrogen Bank pilot auction. Developers of projects for renewable hydrogen production facilities can apply until February 8 via the European Union’s Funding and Tenders Portal.

Bids for a fixed premium of up to EUR 4.5 per kilogram will be ranked from the lowest to the highest, and the subsidies will be awarded in that order until the initial budget of EUR 800 million is exhausted. Projects need to have at least 5 MW in capacity.

The beneficiaries will get support on top of sales revenues for a maximum of 10 years. They will have to start producing renewable hydrogen within five years after signing the agreement, the public call reads.

The support system will connect supply and demand, the European Commission’s Executive Vice-President for the European Green Deal, Interinstitutional Relations and Foresight Maroš Šefčovič said.

“It is about creating transparency about price points, which will help kickstart a European hydrogen market. In turn, this will help accelerate the EU’s clean energy transition while maintaining our competitiveness and preserving Europe’s position as a leading global economic power,” he stressed.

Green hydrogen subsidies to be sourced from EU ETS

The funds will be sourced from the Emissions Trading Scheme (EU ETS) and channeled through the Innovation Fund, the European Commission said. The European Hydrogen Bank mechanism is aimed at accelerating the takeoff of hydrogen in the segments of industrial production and transportation that are hard to decarbonize.

The EU is introducing the premium to bridge the gap between the price of production and the price consumers are currently willing to pay, in a market where non-renewable hydrogen is still cheaper to produce. The REPowerEU plan stipulates that domestic production needs to reach 10 million tons by 2030.

Member states have the opportunity to award subsidies without separate auctioning to projects that ended up below the line

Cumulation with other types of aid from participating member states will not be possible, to ensure a level playing field for all projects regardless of location, the commissioners pointed out. They argued it would prevent fragmentation at the early stages of the market and reduce administrative costs for upcoming national hydrogen support schemes.

In addition, member states can participate in the so-called auctions-as-a-service scheme under the Hydrogen Bank. It will enable them to finance projects that didn’t win support due to budget limitations, without separate auctioning.

Next Hydrogen Bank auction to be worth EUR 2.2 billion

Applicants will be informed about evaluation results as early as April and sign grant agreements within nine months after the call closure, the statement adds. Von der Leyen earlier said the plan is to hold the second round in the spring and that it would be worth EUR 2.2 billion.

“We are delighted to hear that the auction is being launched on time and we are certain it will be fruitful. The Hydrogen Bank auctions are crucial to the success of the European hydrogen industry, and we will learn a lot from it in the next months,” Chief Executive Officer of Hydrogen Europe Jorgo Chatzimarkakis said.

An Innovation Fund call was also launched for the European Economic Area (EEA), with an budget of EUR 1.4 billion. It is for large (capital expenditure above EUR 100 million), medium (EUR 20 million to EUR 100 million) and small (EUR 2.5 million to EUR 20 million) decarbonization projects, cleantech manufacturing, and pilot projects. Hydrogen is set to feature heavily, Hydrogen Europe said.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

CJR Renewables 102 MW Urleasca wind farm Romania

CJR Renewables completes construction of 102 MW Urleasca wind farm in Romania

09 October 2025 - The Urleasca wind farm in Brăila county in eastern Romania is complete, contractor CJR Renewables said

slovenia coal phaseout coal mine velenje golob robert visit

Slovenia begins preparations for closure of Velenje coal mine

09 October 2025 - Slovenian Prime Minister Robert Golob visited the Velenje coal mine to present a draft law on its gradual closure

Metlen Karatzis Greece largest battery joint venture

Karatzis, Metlen to install Greece’s largest battery in joint venture

09 October 2025 - Metlen and Karatzis Group of Companies are establishing a joint venture for a standalone BESS of 330 MW and 790 MWh

world dnv energy transition energy transition outlook 2025

Policy changes in US will have marginal impact on global energy transition

09 October 2025 - AI energy use may seem alarming, but it is projected to stay below EV charging and the cooling of buildings, DNV calculated