Waste

Landfill for Subotica region to be finished next year

bulldozer-construction-works

Photo: Pixabay

Published

August 1, 2016

Country

Comments

comments icon

0

Share

Published:

August 1, 2016

Country:

Comments:

comments icon

0

Share

One of the largest construction sites in Serbia lies between Bikovo and Oromo, in North Bačka District, portal Subotica.com reported. Construction of a regional landfill began in the middle of last year with the aim for the most advanced waste management system to be completed in 2017.

The regional facility for the city of Subotica and the municipalities of Bačka Topola, Mali Iđoš, Senta, Kanjiža, Ada and Novi Kneževac in northwestern Serbia was created as a response to increasing amounts of waste and the need to comply with national and European rules. The fact the region of northern Banat and Bačka has about 260 thousand inhabitants, and that each household produces about a tonne of waste which is stored in the city and illegal dumps, made local authorities move ten years ago to face the issue. In 2008, company Regionalna deponija d.o.o. was founded. Implementation is in line with standards of the European Union and the National Waste Management Strategy for 2010-2019.

Total value of the project is EUR 24 million. EU is supporting it through IPA funds, amounting to EUR 20.15 million. This support is focused on building infrastructure and strengthening the capacity of regional businesses and local public utility companies. The Government of Serbia participates with EUR 3.2 million through the Ministry of Agriculture and Environmental Protection. It finances the procurement of waste collection vehicles, containers and cans. Finally, EUR 1 million will be allocated from the budget of the City of Subotica and six municipalities to build recycling yards and connect to local infrastructure.

Total value of the project is EUR 24 million.

Currently two landfill cassettes are under construction, as well as the waste separation line that will be used to extract all valuable components, said Andrea Kikić, head of Regionalna deponija, the article said. She explained separated recyclable waste like plastic, paper or metal will be baled and temporarily stored before collecting a greater amount for the market. For the processing of waste, composting of biodegradable waste will be carried out in the separate tunnels for clean green waste and biodegradable waste, she added.

The complex of the regional landfill is being built by Italian company Ibi, Set from Šabac and Instel inženjering from Novi Sad. The deadline for completion of the landfill is the beginning of next year, but the contractors submitted a request for an extension, so it will probably be prolonged a little, the portal adds.

Related Articles

green steel electric vehicles study transport environment

Switching to green steel would add just EUR 8 per electric vehicle by 2040

11 July 2024 - Switching to 40% green steel would add just EUR 57 to the sticker price of an electric vehicle in 2030, according to an analysis by T&E

vinca beo cista energija waste to energy facility

Beo Čista Energija officially starts producing energy from waste at Vinča landfill in Belgrade

03 July 2024 - Beo Čista Energija started the waste incineration in February 2023 as a final phase of testing its waste-to-energy facility

co2 is co2 zero waste europe calls for including incineration in eu ets

CO2 is CO2: Zero Waste Europe calls for including incineration in EU ETS

25 June 2024 - Incinerators are poised to become the most carbon-intensive power source once coal is phased out, claims Zero Waste Europe

French firms to build, operate Belgrade’s first wastewater plant

French firms to build, operate Belgrade’s first wastewater plant

24 June 2024 - The large-scale wastewater plant in Veliko Selo would help preserve the water quality and biodiversity of the Danube and Sava rivers