Renewables

Solar panel factory inaugurated in Kosovo*

Published

June 5, 2016

Country

Comments

0

Share

Published:

June 5, 2016

Country:

Comments:

0

Share

A plant with the capacity for the production of 200,000 solar panels a year was launched in Slatina by a venture of J. v. G. Thoma GmbH of Germany and local firm J.v.G Jaha Energy. One tenth of volume is for the local market, while the rest will be exported globally, United States Agency for International Development (USAID) said. The initial Kosovo*-German investment for the factory was EUR 5 million, and 50 people have been hired.

The Desert technology solar panels are made for use in high temperatures, with an enhanced life span. The facility with 3,000 square metres also has BYD storage systems from 10 kWh to 120 kWh, modules and power plant components in the portfolio. The speaker of Kosovo* Assembly Kadri Veseli, ambassador of Germany Angelika Viets, and minister of labour and social welfare Arban Abrashi were present at the inauguration ceremony.

USAID has collaborated with Jaha Energy through the Empower Private Sector programme. Training on solar panel installation techniques and best practices was organized in May and brought together over 45 representatives of solar panel installers across Kosovo*. The company is partnering with Empower in launching the 10,000 Solar Roofs initiative.

* This designation is without prejudice to positions on status and is in line with UNSCR 1244/99 and the ICJ Opinion on the Kosovo declaration of independence.

Related Articles

europe flexibility seasonal balancing iea report

Flexibility needs to be met by demand response, batteries, hydrogen, but also thermal, hydropower plants – IEA

03 May 2024 - The report Managing the Seasonal Variability of Electricity Demand and Supply analyzes the situation in Europe, India, and Indonesia

IPTO suspends all electricity imports until May 7 to protect the Greek system

Greece suspends electricity imports until May 7 to protect system

03 May 2024 - The Greek Independent Power Transmission Operator (IPTO) has announced the suspension of all electricity imports during the hours around noon

Two agrosolar power plants are planned to be constructed in Serbia

Two agrisolar projects launched in northern Serbia

02 May 2024 - In the vicinity of Kikinda in Serbia, two new agrisolar projects are underway: Solar Power Plant Delta and Brankov solar

el-dorado-electricity-imports-north-macedonia-rke

North Macedonia: ‘Solar El Dorado’ cuts electricity imports to 2.75%

02 May 2024 - In 2023, North Macedonia's new solar capacity increased by as much as 251% compared to 2022