Electricity

Montenegro’s EPCG lowers minimum price for sale of 10% of its shares

Montenegro EPCG minimum price of 10 shares

Photo: EPCG

Published

August 5, 2022

Country

Comments

comments icon

0

Share

Published:

August 5, 2022

Country:

Comments:

comments icon

0

Share

Faced with a deadline to sell a 10% stake, Montenegro’s state-owned utility EPCG cut the minimum price to EUR 87 million from over EUR 100 million, even though the package is worth just EUR 41.3 million in market terms.

Montenegro’s government-controlled coal and electricity producer Elektroprivreda Crne Gore (EPCG) published another call for the sale of 10% of its shares after there were no bids for purchasing them for at least EUR 8.63 apiece. It cut the minimum price to EUR 7.33 per share, or by 15.1%.

However, the company currently trades at just EUR 3.5 per share at the Montenegro Stock Exchange, valuing the stake at EUR 41.3 million. The minimum price now for the 10% stake is EUR 87 million.

The package can be sold to a single buyer in a so-called block transaction. EPCG said last year it would look for foreign partners for green energy projects.

The utility bought off the 10% stake from Italy-based minority owner A2A in 2019 for EUR 52.9 million. The shares carry no voting rights. If it doesn’t sell it by September 26, EPCG must write off the package.

In comparison, EPCG’s book value is EUR 770 million. The conditions for bidders didn’t change from the last call. The deadline is August 12.

EPCG is based in Nikšić, Montenegro’s second-largest city. It has 877 MW in installed power capacity. The company operates the country’s only coal power plant – Pljevlja, hydroelectric plants Perućica and Piva, and five small hydropower units.

The state-owned utility is facing a high import bill because of the impact of the severe drought on its hydropower plants. Furthermore, in April it started the reconstruction of the Pljevlja plant, which will need to suspend operations in the later phase.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

bih croatia south interconnection pipeline intergovernmental agreement three seas kristo plenkovic

BiH, Croatia sign agreement on Southern Gas Interconnection

29 April 2026 - Bosnia and Herzegovina and Croatia have signed an intergovernmental agreement on the construction of the Southern Gas Interconnection

croatia grid connection fee hera decision

Croatia finally sets grid connection fee

29 April 2026 - The Croatian Energy Regulatory Agency (HERA) has adopted the fee for the connection to the electricity network

TerraPower Natrium Rendering nuclear power plant

TerraPower starts building 345 MW nuclear plant in US using advanced Natrium technology

29 April 2026 - The facility is set to become “the first utility-scale advanced nuclear power plant in the United States,” TerraPower said

Aktor LNG USA signs 20 year supply deal with Albania's Albgaz

Aktor LNG USA signs 20-year supply deal with Albania’s Albgaz

29 April 2026 - Aktor LNG USA and ALBGAZ signed a 20-year commercial agreement for liquefied natural gas (LNG) from the United States