Electricity

Montenegro’s EPCG lowers minimum price for sale of 10% of its shares

Montenegro EPCG minimum price of 10 shares

Photo: EPCG

Published

August 5, 2022

Country

Comments

comments icon

0

Share

Published:

August 5, 2022

Country:

Comments:

comments icon

0

Share

Faced with a deadline to sell a 10% stake, Montenegro’s state-owned utility EPCG cut the minimum price to EUR 87 million from over EUR 100 million, even though the package is worth just EUR 41.3 million in market terms.

Montenegro’s government-controlled coal and electricity producer Elektroprivreda Crne Gore (EPCG) published another call for the sale of 10% of its shares after there were no bids for purchasing them for at least EUR 8.63 apiece. It cut the minimum price to EUR 7.33 per share, or by 15.1%.

However, the company currently trades at just EUR 3.5 per share at the Montenegro Stock Exchange, valuing the stake at EUR 41.3 million. The minimum price now for the 10% stake is EUR 87 million.

The package can be sold to a single buyer in a so-called block transaction. EPCG said last year it would look for foreign partners for green energy projects.

The utility bought off the 10% stake from Italy-based minority owner A2A in 2019 for EUR 52.9 million. The shares carry no voting rights. If it doesn’t sell it by September 26, EPCG must write off the package.

In comparison, EPCG’s book value is EUR 770 million. The conditions for bidders didn’t change from the last call. The deadline is August 12.

EPCG is based in Nikšić, Montenegro’s second-largest city. It has 877 MW in installed power capacity. The company operates the country’s only coal power plant – Pljevlja, hydroelectric plants Perućica and Piva, and five small hydropower units.

The state-owned utility is facing a high import bill because of the impact of the severe drought on its hydropower plants. Furthermore, in April it started the reconstruction of the Pljevlja plant, which will need to suspend operations in the later phase.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Montenegro first renewable energy auctions green transition

Montenegro preparing first renewable energy auction to accelerate green transition

03 June 2025 - A model for Montenegro's first auction for market premiums for solar power was outlined at an event in the capital Podgorica

bih trebinje zhongbo wind farm

Zhongbo Group to install wind farm near Trebinje

03 June 2025 - In September last year, the Government of the Republic of Srpska signed an agreement on strategic cooperation with Zhongbo Group

bih cbam cost analysis federation bih niksic

CBAM could cost BiH up to EUR 1.6 billion; PM Nikšić signals potential delay

03 June 2025 - The analysis was prepared by the Ministry of Foreign Trade and Economic Relations of BiH, with support from EU and the EU4Energy project

Wind power investments Turkey surge major plants inaugurated in May

Wind power investments in Turkey surge as major plants inaugurated in May

03 June 2025 - Investments in wind power in Turkey are expected to surpass USD 1.5 billion this year, translating to 1.5 GW of new capacity