Renewables

Nordex obtains turbine orders for more than 40 MW

Published

April 14, 2016

Country

Comments

comments icon

0

Share

Published:

April 14, 2016

Country:

Comments:

comments icon

0

Share

In the first quarter of 2016, Nordex SE was selected for three projects with a total of more than 40 MW in Turkey. These projects, for 18 turbines altogether, are located in different regions of the country and cover wind classes IEC 1 to 3.

The largest of the projects is the Karacabey wind farm in the province of Bursa in the country’s northwest, where the German-based company will supply 12 N100/2500 turbines for to Arti Enerji AŞ, install them on a turnkey basis, and hand them over to the customer ready for operation. The N100/2500 is designed for IEC-2 sites so ideally suits the location of Karacabey, Nordex said.

The European manufacturer will be supplying four N117/2400s for the Aliaga extension. This project is situated in a region with light winds in Izmir, in the province of Aliaga. The four Nordex turbines will add 9.6 MW to the wind farm.

Nordex said last year was strong, with a significant volume of projects achieving closing in the last quarter. The company has 1.3 GW installed capacity in Turkey, with a market share of around 25%, the statement adds.

Related Articles

turkey 2026 vision energy Alparslan Bayraktar

Turkey to launch carbon market, sign deals for large renewables projects in 2026

26 December 2025 - These developments represent the core of the 2026 vision for energy and mining in Turkey, revealed by Minister Alparslan Bayraktar

Israel Greece Cyprus reaffirm commitment to joint energy projects

Israel, Greece, Cyprus reaffirm commitment to joint energy projects

25 December 2025 - Israel, Greece and Cyprus vowed to safeguard their sea lanes and critical infrastructure against emerging threats

Serbia EPS mulls using heat pumps hydropower plants

Serbia’s EPS mulls using heat pumps at its hydropower plants

25 December 2025 - Elektroprivreda Srbije (EPS) wants to commission a study of the potential use of heat pumps at four hydropower plants in southwestern Serbia

H-Bridges team, IFEC

H-Bridges team from Belgrade returns to IFEC: students developing bidirectional EV charger

25 December 2025 - H-Bridges, a team of students from the ETF in Belgrade, is preparing for IFEC 2026 with a project for a bidirectional charger for electric vehicles