News

Government sacks power utility head for misspending

Published

March 8, 2016

Comments

comments icon

0

Share

Published:

March 8, 2016

Comments:

comments icon

0

Share

Prime minister Aleksandar Vučić said the purchase of two Audi vehicles was the last drop which led Aleksandar Obradović, chief executive of state-owned Electric Power Industry of Serbia (EPS), to be relieved of his duty, B92 portal reported. The new head of the company will be picked through public contest, the premier said.

Asked whether there’s indication Obradović is responsible for anything more drastic than what he got demoted for, Vučić said it’s a question for state authorities. Speaking earlier for state broadcaster RTS, he announced the dismissal due to failure to comply with austerity measures. Vučić also said he is unhappy with the restructuring of EPS.

The Fiscal Council recently stated the public company’s business results currently pose the greatest risk to Serbia’s public finances. The independent state body’s president Pavle Petrović stated EPS had “a bunch of problems” and singled out the number of employees and their high salaries.

Union representatives have cut demands for severance pay from EUR 1,500 to EUR 900 per year of service for those who are about to be laid off. The decrease in headcount is part of the current arrangement with the International Monetary Fund.

Related Articles

Montenegro NECP public consultation sole coal plant shutdown 2041

Montenegro publishes NECP for public consultation – sole coal plant planned for shutdown in 2041

30 June 2025 - The retirement of the Pljevlja coal plant is planned for 2041, but it depends on a just transition and supply security, the draft NECP reads

hydrogen natural gas pipeline

Serbia plans hydrogen transport through gas pipelines

30 June 2025 - Gas transmission system operator Transportgas has invited bids for producing a study on hydrogen transport through the gas network

LONGi ignites Romania energy transition 54 1 MW BC

LONGi ignites Romania’s energy transition with 54.1 MW BC technology triumph

30 June 2025 - A PV plant in Romania's northwest is on schedule for a grid connection in the fourth quarter. It features LONGi Solar's BC modules.

Delyan Iliev, Managing Director of REIB

Energy storage in focus: How custom insurance solutions are fueling Southeast Europe’s green transition

27 June 2025 - Delyan Iliev, Managing Director of Renewable Energy Insurance Broker (REIB), talks about the critical role of custom-made insurance solutions in the success of BESS projects.