Waste

Slovenia to build three mixed waste incinerators, solve sludge issue

Slovenia three mixed waste incinerators sludge

Photo: Dani Argandona on Unsplash

Published

June 11, 2021

Country

Comments

comments icon

1

Share

Published:

June 11, 2021

Country:

Comments:

comments icon

1

Share

Unsorted municipal waste in Slovenia could be burnt entirely from 2023, as Minister of the Environment and Spatial Planning Andrej Vizjak says the government would determine concession areas and help municipalities build three more incinerators. He added a system would be developed for the thermal treatment of municipal sludge.

All reasonable states incinerate mixed municipal waste in appropriate facilities, Minister of the Environment and Spatial Planning Andrej Vizjak told state-controlled news agency STA. Authorities in the capital city of Ljubljana and in Maribor and Kočevje expressed interest in installing such systems, the article adds.

Slovenia has only one incinerator for municipal waste

The government will draw up concession areas and financially help municipalities with the construction of incinerators in Slovenia through concessions, Vizjak explained. The only facility that burns only waste is the heating plant in Celje, the country’s third-largest city. It produces electricity and heat for the district heating system. Five other plants add a share of waste to other fuels.

The Regional Centre for Waste Treatment and Recovery (RCERO) in Ljubljana produces heat and electricity by burning gas obtained through anaerobic fermentation.

https://youtu.be/aBpYjMMfnys

Vizjak claimed the construction of the waste incinerators in Slovenia could start early next year and that they would be finished by the end of 2023. Slovenia will be divided into four regions for the units to cover and the municipalities already reached an agreement, he said and added the project yet needs to be developed in the technical sense.

Nowhere to send municipal sludge

The minister revealed the plan after 200 tons of waste sludge were illegally dumped in Pivola in the municipality of Hoče-Slivnica and severely polluted a creek. Vizjak noted that Hungary, where Slovenia was shipping most of the material generated on its territory, banned the imports in 2019.

Slovenia earmarked EUR 7 million for the treatment of sludge from the sewer and septic tanks

The ministry believes sludge from the sewer and septic tanks should be dried locally and sent for incineration in regional centers, he stressed. Vizjak pointed out that EUR 1 million from the country’s climate change fund was earmarked for the purpose for this year and that a total of EUR 6 million would be spent in the following two years.

Sludge can be incinerated after phosphorus is removed and it can be a source of electricity and heat, the minister said.

Večer reported that the illegally dumped waste came from the Ptuj municipal utility, while the firm said it handed the sludge to its contractor CEP from Celje, which denied any wrongdoing.

Comments (1)
Skendraoui Hocine / April 7, 2024

Grenat, very useful
Can I have more details about this method please
I’m wastewater treatment engineer from Algeria, we have In one state 5 wastewater treatment plant which produce more than 150 t/d of sludge
And we look for solutions
Thanks

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

green steel electric vehicles study transport environment

Switching to green steel would add just EUR 8 per electric vehicle by 2040

11 July 2024 - Switching to 40% green steel would add just EUR 57 to the sticker price of an electric vehicle in 2030, according to an analysis by T&E

vinca beo cista energija waste to energy facility

Beo Čista Energija officially starts producing energy from waste at Vinča landfill in Belgrade

03 July 2024 - Beo Čista Energija started the waste incineration in February 2023 as a final phase of testing its waste-to-energy facility

co2 is co2 zero waste europe calls for including incineration in eu ets

CO2 is CO2: Zero Waste Europe calls for including incineration in EU ETS

25 June 2024 - Incinerators are poised to become the most carbon-intensive power source once coal is phased out, claims Zero Waste Europe

French firms to build, operate Belgrade’s first wastewater plant

French firms to build, operate Belgrade’s first wastewater plant

24 June 2024 - The large-scale wastewater plant in Veliko Selo would help preserve the water quality and biodiversity of the Danube and Sava rivers