News

GGF sets USD 11 million credit line for Odeabank

Published

December 21, 2015

Comments

comments icon

0

Share

Published:

December 21, 2015

Comments:

comments icon

0

Share

Projects of wind and geothermal energy as well as, increasingly, in the photovoltaic sector are in the focus of a new package secured by Green for Growth Fund, Southeast Europe (GGF) for Odeabank. The Istanbul-based financial institution plans to finance mainly renewable energy with the loans worth a total USD 11 million (EUR 10.16 million).

While Turkey’s current electricity mix still relies heavily on fossil fuels (coal- and gas-fired plants account for more than two thirds of inland power generation), it holds vast resources in almost all types of renewable energy, GGF said. Projects funded by the facility are estimated to reduce primary energy consumption by up to 12 GWh and carbon dioxide emissions by 2,640 metric tons per year. Odeabank is a subsidiary of Lebanon-based Bank Audi, operating in the Middle East and North Africa. In order to further optimize Odeabank’s environmental & social expertise, GGF’s technical assistance facility will contribute to the internal training program with additional seminars.

 

Related Articles

bih geothermal energy bijeljina study rgf belgrade

Bijeljina in BiH eyes geothermal energy utilization

26 March 2026 - The city signed contracts for the development of a scientific study on the geothermal potential and options for multi-purpose use

international day of zero waste food waste

International Day of Zero Waste 2026: Everyone has a role to play in reducing food waste

26 March 2026 - This year’s International Day of Zero Waste, observed on March 30, focuses on ways to reduce food waste worldwide

BiH town Gacko opposes 200 MW solar power project on agricultural land

BiH town Gacko opposes 200 MW solar power project on agricultural land

26 March 2026 - Local assembly in Gacko in Bosnia and Herzegovina withdrew support for a PV project on more than 200 hectares of agricultural land

Romania Hidroelectrica contractor Nehoiașu 2 hydropower

Romania’s Hidroelectrica to pick contractor for Nehoiașu 2 hydropower project

26 March 2026 - Hidroelectrica is selecting a company for the supply and installation of the equipment for the Nehoiașu 2 hydropower plant.