News

Metka’s subsidiary wins international contracts

Published

December 28, 2015

Comments

comments icon

0

Share

Published:

December 28, 2015

Comments:

comments icon

0

Share

Athens-listed firm Metka said its subsidiary Metka EGN has signed contracts for turn-key engineering, procurement and construction (EPC) as well as the operation and maintenance of seven photovoltaic power production units with a total capacity of over 116 MW in Puerto Rico and the United Kingdom.

The contracts add up to EUR 112 million, the company announced. Metka, owner of 50.1% of the subsidiary, is a member of the Mytilineos Group. The largest of the contracts is with Oriana Energy LLC, a subsidiary of independent solar power producer Sonnedix Group, (IPP), for a 57 MW project in Puerto Rico. Together with the EPC for the solar plant, which will be completed in mid-2016, Metka EGN will also provide operation and maintenance services.

Further six contracts have been signed for projects in the United Kingdom with investors including Lightsource and Moser Baer, both existing clients, and Canadian Solar, a new one, the press release said.

Metka EGN is a joint venture with Egnatia Group, established in October and focused on utility-scale projects for the global solar power market. The two Greek companies have operations in the Middle East, while Egnatia owns solar parks in Romania and Bulgaria, too. Its portfolio in the Balkans, including Greece, consists of facilities with the capacity between 8.6 MW and 13 MW.

Related Articles

3rd Conference on Advancing Renewable Investments guarantees of origin could drive Europe green energy integration

3rd Conference on Advancing Renewable Investments – guarantees of origin could drive Europe’s green energy integration

21 November 2025 - As CBAM nears implementation, the Ljubljana conference highlighted the tools to accelerate integration with the EU, the Energy Community Secretariat said

montenegro admir sahmanovic energetika teska godina pljevlja potrosnja struje

Šahmanović: Montenegro is facing its most challenging year for energy sector

20 November 2025 - Priorities are price stability, increasing the use of renewables, and strengthening the country's position as an energy hub, Šahmanović said

Alcazar take over NIAT wind farm 500 MW in Egypt Siemens Gamesa after completion

Alcazar to take over NIAT wind farm of 500 MW in Egypt from Siemens Gamesa after completion

20 November 2025 - Alcazar formalized the partnership for the final development, construction and operation of Siemens Gamesa's NIAT wind project in Egypt

romania dri dtek vacaresti solar park murat cinar

DRI nears 300 MW renewables portfolio in Romania

20 November 2025 - DRI's portfolio in Romania consists of wind parks and photovoltaic plants. DRI is the renewables division of Ukraine-based DTEK Group