Energy Efficiency

Credit Agricole Serbia, KfW secure EUR 25 million for loans for energy efficiency, renewables

Credit-Agricole-Serbia-KfW-EUR-25-million-energy-efficiency-renewables

Photo: Pixabay

Published

February 11, 2020

Country

Comments

comments icon

0

Share

Published:

February 11, 2020

Country:

Comments:

comments icon

0

Share

Credit Agricole Serbia has signed a EUR 25 million loan agreement with KfW bank to finance projects in energy efficiency and renewable energy sources.

Entrepreneurs, small and medium-sized businesses as well as agricultural producers will have the opportunity to get grants and free assistance from technical consultants who assess the feasibility and cost effectiveness of the project, Credit Agricole Serbia said on its website.

Projects eligible for funding are for primary energy savings of at least 20% or a reduction of CO2 emissions of at least 20%

The agreement is a continuation of cooperation with KfW, under which the two lenders fund projects with primary energy savings of at least 20% or a CO2 reduction of at least 20%, Credit Agricole Serbia told Balkan Green Energy News.

The client can receive a 10% grant from the value of the project

The client is entitled to a 10% grant for RES projects, or 5%-10% for other projects, depending on the results of the energy efficiency measures.

Entrepreneurs, cooperatives, registered agricultural producers with active status and legal entities with up to 250 employees and an annual turnover of up to EUR 50 million, based on consolidated financial results, are eligible for grants, Credit Agricole Serbia said.

The maximum repayment schedule is seven years, with a grace period of up to 12 months

The loans for clients will have the maximum repayment schedule of seven years, with a grace period of up to 12 months. The maximum loan amount is EUR 1 million for energy efficiency projects and EUR 3 million for RES projects.

The KfW requirements must be met in order to receive the grant

In order to get a loan, it is necessary for the client to contact the bank and apply for financing.

If the investment involves replacing existing equipment with energy-efficient gear, the documentation for the purchase and for the used equipment must be provided to determine whether the replacement provides a reduction of CO2 emissions or a reduction of primary energy consumption of at least 20%.

The funds can be used for new machinery, equipment, vehicles

The funds can be spent on new machinery, equipment (biomass boilers, biomass dryers, solar panels, refrigerator compressors, incubator stations) and vehicles for business purposes, Credit Agricole Serbia explains.

After the investment is implemented, the KfW consultants evaluate the project

If the investment is for RES (biogas and solar power plants) or other efficiency measures (insulation for buildings, lighting replacement, heating system reconstruction), the client needs to to submit a business plan. It will be used to determine if the investment secures a reduction of CO2 emissions or a reduction of primary energy consumption of at least 20%.

After the investment is implemented, KfW consultants perform a project evaluation and confirm whether it is in accordance with its conditions, after which the client gets the grant, according to Credit Agricole Serbia.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Green for Growth Fund financial impact targets 2023

Green for Growth Fund tops its financial, impact targets in 2023

15 July 2024 - The Green for Growth Fund kept mitigating climate change and promoting sustainable economic growth last year in its 18 markets

Heat pumps and electric cars expected to bring small rise in power demand for Greece

Heat pumps, electric cars expected to contribute little to power demand growth in Greece

10 July 2024 - Contrary to earlier estimates, heat pumps and electric cars are not expected to significantly raise electricity demand in Greece.

vinca beo cista energija waste to energy facility

Beo Čista Energija officially starts producing energy from waste at Vinča landfill in Belgrade

03 July 2024 - Beo Čista Energija started the waste incineration in February 2023 as a final phase of testing its waste-to-energy facility

Zoran Lajovic Metalfe Group

Green Steel from Sremska Mitrovica – responsible industry for sustainable future

24 June 2024 - Serbian company Metalfer Group, whose production portfolio includes the so-called Metalfer® Green Steel, has demonstrated that steelmaking can be sustainable and responsible