Renewables

Antalya football arena will generate green power

Published

September 24, 2015

Country

Comments

comments icon

0

Share

Published:

September 24, 2015

Country:

Comments:

comments icon

0

Share

In Turkey, the Süper Lig is growing and TOKI, the governmental agency for housing, is building a stadium in Antalya in cooperation with the Ministry of Youth and Sports. Total cost is almost TRY 80 million (EUR 25 million), and 5% is for a 1,4 MW solar plant project, which will take almost six years to return the investment.

Omron Corporation from Kyoto, Japan, said it would supply 124 string inverters KP100L.

The sports facility has a capacity of nearly 33.000 covered seats. Designed by Azaksu Architects, it includes a solar plant on its 10.000 square metres rooftop area, to help general profitability selling energy to the grid. The project of the plant has been carried by Seiso, one of the leading suppliers in the Turkish photovoltaic market, the press release said.

The plant, with 5,600 JA Solar’s mono-crystalline modules, has one of the highest capacities of solar power generation in stadiums, aiming to apply for Guinness Records, Omron said. Annual yield expectation is 2.15 GWh, and it will be connected on grid to sell electricity as two times 700 kW of non-licenced application for 10 years over feed-in tariffs, Omron added.

Because of the full cylindric form of the stadium, each panel line is exposed to sunlight from a different angle. In order to obtain maximum performance, the system is made of small pieces, each one with a 10 kW inverter. Omron Corporation supplies products and services for industrial automation, electronic and healthcare.

Related Articles

KKR Greenvolt EUR 150 million capital boost

KKR to provide Greenvolt with EUR 150 million capital boost

01 August 2025 - Greenvolt Group said its majority owner KKR fully subscribed to a EUR 150 million share capital increase, with a focus on battery investments

bulgaria apste solar panels batteries fees recycling prices gazdov

APSTE: High state fees for PV panels, energy storage batteries inhibit electricity price decrease in Bulgaria

01 August 2025 - The government's fees are between five and 10 times higher than the European Union average, according to APSTE

Serbia adopts Just Energy Transition Plan until 2030

Serbia adopts Just Energy Transition Plan until 2030

01 August 2025 - Serbia now has a Just Energy Transition Plan until 2030, with suggestions how to mitigate of the impact of reducing fossil fuel use

New systems protect birds from wind turbine collisions

New systems protecting birds from wind turbine collisions

31 July 2025 - Croatian company Oikon has become a regional representative for three systems that detect the presence of birds and temporarily stop the operation of wind turbines.