Renewables

Elsewedy agrees to buy 4 wind farms, 1 SHPP in Greece

Photo: Pixabay

Published

June 28, 2019

Country

Comments

comments icon

0

Share

Published:

June 28, 2019

Country:

Comments:

comments icon

0

Share

Egypt’s Elsewedy Electric, an integrated energy and infrastructure solution provider, has announced entering into a share purchase agreement with R.F. Energy S.A. (a subsidiary of F.G Europe S.A.) to acquire 100% of the share capital of 3 wind energy and 1 hydropower companies in operation in Greece. The total consideration agreed is EUR 55 million, Elsewedy said in a press release.

The 4 companies in Greece that Elsewedi Electric has agreed to buy have an aggregate capacity of 63.6 MW, including three wind farms – Aioliki Kilindrias SA, Kallisti Energeiaki SA, and Aioliki Aderes SA – and one small hydropower plant (SHPP) – Hydroelectriki Achaias SA.

The assets in Greece generate enough energy to power approximately 34,000 homes with an equivalent carbon dioxide (CO2) footprint of 102,000 tons, according to Elsewedy’s press release.

The assets generate enough energy to power 34,000 homes with an equivalent CO2 footprint of 102,000 tons

The assets benefit from a fixed tariff for all of the generated capacity under Power Purchase Agreements (PPA) for tenors varying from 12 years to 20 years. The PPAs stipulate that the public utility offtaker DAPEEP guarantees the purchase of all the energy produced at the wind farms.

The assets benefit from a fixed tariff for all of the generated capacity under Power Purchase Agreements

The wind farms are located at Ermioni in Argolida, Tsouka in Arcadia, Kilkis in Macedonia and Achaia. The assets benefit from existing infrastructure and interconnections. All the wind farms use Vestas Wind Turbine Generators (WTG) and are under Operation & Maintenance contract with Vestas Hellas Wind Technology S.A.R.F. Energy S.A.

The transaction is making Elsewedi Electric one of the top renewable energy operators in Greece, commented President and CEO Ahmed Elsewedy.

Elsewedy Electric has a portfolio incorporating all traditional and renewable energy areas along with related services. It is one of the largest manufacturers of cables and meters worldwide, especially smart meters, according to the press release.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Greece DEPA Commercial financing 816 MW solar power portfolio

Greece’s DEPA Commercial obtains financing for 816 MW solar power portfolio

26 July 2024 - State-controlled DEPA Commercial received a EUR 390 million loan from the EIB for photovoltaic projects across Greece

serbia energy cooperative solar power plant elektropionir

First cooperative solar power plants in Serbia start production

26 July 2024 - The income from the sale of electricity will be used for projects proposed by the communities of the villages on the Stara planina mountain

faria renewables mykonos solar power plant

Faria Renewables acquires 35 MW Mykonos solar project

26 July 2024 - Faria Renewables S.A. has announced the integration of photovoltaic project Mykonos into its asset portfolio

Ameresco Sunel Energy 560 MW solar power Greece Lightsource bp

Ameresco Sunel Energy starts building 560 MW solar power plant in Greece for Lightsource bp

26 July 2024 - Ameresco Sunel Energy is the contractor in Lightsource bp's solar power project of 560 MW in peak capacity, in the central part of Greece