News

EU helps preparations for emissions trading system

Published

September 3, 2015

Comments

comments icon

0

Share

Published:

September 3, 2015

Comments:

comments icon

0

Share

Project ‘Creation of a Monitoring, Reporting and Verifying System for Successful Implementation of EU Emissions Trading System’ was successfully implemented, said Oskar Benedikt, deputy head of the European Union Delegation to Serbia. At a presentation in Belgrade, he stressed that the effects of climate change are already felt, such as increased temperature with “partial consequence” being greater influx of refugees. The project is aimed at harmonisation of Serbian legislation with the EU and continuous monitoring of greenhouse gas emissions stemming from industrial and power plants. Ambassador of France to Serbia Christine Moro said that fighting climate change was at the same time “an opportunity and a source of innovation and increased competitiveness.”

The two-year endeavour was funded by the EU with EUR 1 million and implemented in cooperation with French, German and Austrian government institutions as well as through the support from EU Delegation to Serbia. Benedikt also said that every country, including Serbia, would require a lot of money to adapt to climate change and added that EU was willing to support Serbia in that regard.

Investment in decreasing greenhouse gases emission is one of possible contributions in reviving Serbian industry and ensuring its competitiveness in the long run, said Serbian minister of agriculture and environmental protection Snežana Bogosavljević Bošković. She added Serbia was required to implement the component dealing with monitoring, reporting and verifying in the first phase, whereas the beginning of emission trading system depends on the outcome of EU accession negotiations with European Commission. The minister pointed out that 128 industrial and power plants would be responsible for implementation of monitoring, reporting and verifying greenhouse gases emission during the implementation of the project.

Bogosavljević Bošković said there are 128 industrial and energy facilities which will need to report on their emissions. The system will be established in 2017, she added.

Related Articles

bih croatia south interconnection pipeline intergovernmental agreement three seas kristo plenkovic

BiH, Croatia sign agreement on Southern Gas Interconnection

29 April 2026 - Bosnia and Herzegovina and Croatia have signed an intergovernmental agreement on the construction of the Southern Gas Interconnection

croatia grid connection fee hera decision

Croatia finally sets grid connection fee

29 April 2026 - The Croatian Energy Regulatory Agency (HERA) has adopted the fee for the connection to the electricity network

TerraPower Natrium Rendering nuclear power plant

TerraPower starts building 345 MW nuclear plant in US using advanced Natrium technology

29 April 2026 - The facility is set to become “the first utility-scale advanced nuclear power plant in the United States,” TerraPower said

Aktor LNG USA signs 20 year supply deal with Albania's Albgaz

Aktor LNG USA signs 20-year supply deal with Albania’s Albgaz

29 April 2026 - Aktor LNG USA and ALBGAZ signed a 20-year commercial agreement for liquefied natural gas (LNG) from the United States